Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,140
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0261 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $571 | $249 | Implemented |
SU0261 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,455 | $1,114 | Implemented |
SU0261 # 07 Y:2007 | 07 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,895 | $7,860 | Implemented |
SU0261 # 08 Y:2007 | 08 | 2007 | REDUCE VENTILATION AIR | $12,057 | $13,919 | Implemented |
SU0261 # 09 Y:2007 | 09 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $354 | $630 | Not Implemented |
SU0261 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,800 | $5,887 | Implemented |
SU0261 # 11 Y:2007 | 11 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $40 | $153 | Implemented |
SU0261 # 12 Y:2007 | 12 | 2007 | INSTALL OCCUPANCY SENSORS | $368 | $1,801 | Implemented |
SU0261 # 13 Y:2007 | 13 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,169 | $135,500 | Implemented |
AM0525 # 01 Y:2007 | 01 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $29,000 | $6,930 | Implemented |
AM0525 # 02 Y:2007 | 02 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,170 | $0 | Implemented |
AM0525 # 03 Y:2007 | 03 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,020 | $0 | Implemented |
AM0525 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,200 | $1,420 | Implemented |
AM0525 # 05 Y:2007 | 05 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,095 | $0 | Implemented |
AM0525 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $830 | $375 | Implemented |
AM0525 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $260 | $70 | Implemented |
AM0525 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $170 | $200 | Implemented |
MA0610 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,053 | $49,555 | Not Implemented |
MA0610 # 02 Y:2007 | 02 | 2007 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,760 | $7,600 | Implemented |
MA0610 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,399 | $10,600 | Implemented |
MA0610 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,743 | $4,700 | Implemented |
MA0610 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,320 | $2,782 | Not Implemented |
MA0610 # 06 Y:2007 | 06 | 2007 | INSULATE BARE EQUIPMENT | $94 | $100 | Implemented |
UU0109 # 01 Y:2006 | 01 | 2006 | OPTIMIZE PLANT POWER FACTOR | $1,800 | $2,220 | Not Implemented |
UU0109 # 02 Y:2006 | 02 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $24,880 | $20,000 | Not Implemented |