IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,140

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0329 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $615 $1,500 Not Implemented
AS0329 # 03 Y:2002 03 2002 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,444 $43,930 Not Implemented
AS0329 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $94 $48 Not Implemented
AS0329 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $591 $737 Implemented
CO0504 # 01 Y:2002 01 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,040 $7,000 Implemented
CO0504 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,250 $1,950 Implemented
CO0504 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $371 $0 Implemented
CO0504 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $44 $44 Implemented
OK0638 # 01 Y:2002 01 2002 INSTALL SET-BACK TIMERS $6,131 $0 Not Implemented
OK0638 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,120 $6,442 Implemented
OK0638 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $1,798 $862 Implemented
OK0638 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $485 $0 Not Implemented
OK0638 # 05 Y:2002 05 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,536 $500 Not Implemented
OK0638 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $623 $1,067 Implemented
OK0638 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,046 $10 Not Implemented
SU0136 # 01 Y:2002 01 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,000 $0 Not Implemented
SU0136 # 02 Y:2002 02 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,245 $0 Implemented
SU0136 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,526 $270 Not Implemented
SU0136 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,696 $60 Not Implemented
SU0136 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,332 $107 Not Implemented
SU0136 # 06 Y:2002 06 2002 REDUCE VENTILATION AIR $1,494 $104 Not Implemented
SU0136 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $1,836 $5,750 Not Implemented
SU0136 # 08 Y:2002 08 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,654 $0 Implemented
SU0136 # 09 Y:2002 09 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,569 $0 Not Implemented
SU0136 # 10 Y:2002 10 2002 INSULATE BARE EQUIPMENT $1,249 $700 Not Implemented