IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0271 # 05 Y:2023 05 2023 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $122 $65 n/a
UA0271 # 04 Y:2023 04 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,447 $13,906 n/a
UA0271 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $66,296 $2,275 n/a
UA0271 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,935 $24,359 n/a
UA0271 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $925 $377 n/a
UA0246 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,600 $9,695 Implemented
UA0246 # 02 Y:2021 02 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,152 $150 Not Implemented
UA0246 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,692 $373 Not Implemented
UA0246 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $855 $1,067 Implemented
UA0068 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $1,210 $2,719 Not Implemented
UA0068 # 05 Y:2011 05 2011 DISCONNECT BALLASTS $3,015 $607 Not Implemented
UA0068 # 01 Y:2011 01 2011 INSTALL TIMERS AND/OR THERMOSTATS $16,400 $5,100 Implemented
UA0068 # 02 Y:2011 02 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $15,438 $13,988 Implemented
UA0068 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,210 $4,238 Not Implemented
UA0068 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,451 $46,341 Implemented
UA0063 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,938 $1,003 Implemented
UA0063 # 08 Y:2011 08 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $35,465 $27,200 Implemented
UA0063 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $524 $202 Not Implemented
UA0063 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,363 $3,900 Implemented
UA0063 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,417 $1,000 Implemented
UA0063 # 04 Y:2011 04 2011 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $28,528 $3,584 Implemented
UA0063 # 03 Y:2011 03 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,580 $100 Not Implemented
UA0063 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,438 $23,295 Implemented
GT0356 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,680 $32,200 Implemented
GT0356 # 02 Y:1988 02 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,342 $3,313 Not Implemented