Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0271 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,935 | $24,359 | n/a |
UA0271 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $925 | $377 | n/a |
UA0271 # 04 Y:2023 | 04 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,447 | $13,906 | n/a |
UA0271 # 03 Y:2023 | 03 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $66,296 | $2,275 | n/a |
UA0271 # 05 Y:2023 | 05 | 2023 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $122 | $65 | n/a |
UA0246 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $855 | $1,067 | Implemented |
UA0246 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,692 | $373 | Not Implemented |
UA0246 # 02 Y:2021 | 02 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,152 | $150 | Not Implemented |
UA0246 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,600 | $9,695 | Implemented |
UA0068 # 06 Y:2011 | 06 | 2011 | INSTALL OCCUPANCY SENSORS | $1,210 | $2,719 | Not Implemented |
UA0068 # 05 Y:2011 | 05 | 2011 | DISCONNECT BALLASTS | $3,015 | $607 | Not Implemented |
UA0068 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,451 | $46,341 | Implemented |
UA0068 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,210 | $4,238 | Not Implemented |
UA0068 # 01 Y:2011 | 01 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $16,400 | $5,100 | Implemented |
UA0068 # 02 Y:2011 | 02 | 2011 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $15,438 | $13,988 | Implemented |
UA0063 # 08 Y:2011 | 08 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $35,465 | $27,200 | Implemented |
UA0063 # 07 Y:2011 | 07 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $524 | $202 | Not Implemented |
UA0063 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $53,363 | $3,900 | Implemented |
UA0063 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $30,417 | $1,000 | Implemented |
UA0063 # 04 Y:2011 | 04 | 2011 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $28,528 | $3,584 | Implemented |
UA0063 # 03 Y:2011 | 03 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $17,580 | $100 | Not Implemented |
UA0063 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $2,938 | $1,003 | Implemented |
UA0063 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,438 | $23,295 | Implemented |
GT0356 # 05 Y:1988 | 05 | 1988 | IMPROVE LUBRICATION PRACTICES | $10,600 | $1,830 | Implemented |
GT0356 # 03 Y:1988 | 03 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,859 | $8,805 | Implemented |