IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0528 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,512 $150 Implemented
LE0528 # 07 Y:2022 07 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,451 $15,000 Implemented
LE0528 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,188 $2,000 Not Implemented
LE0528 # 05 Y:2022 05 2022 UPGRADE OBSOLETE EQUIPMENT $150,000 $150,000 Implemented
LE0528 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,953 $1,000 Implemented
LE0528 # 03 Y:2022 03 2022 UPGRADE OBSOLETE EQUIPMENT $150,000 $90,000 Implemented
LE0528 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,359 $40 Not Implemented
LE0527 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,621 $1,330 Implemented
LE0527 # 01 Y:2022 01 2022 PAY BILLS ON TIME TO AVOID LATE FEES $1,805 $0 Implemented
LE0527 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $103 $40 Not Implemented
LE0527 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,500 $3,435 Implemented
LE0527 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,154 $160,000 Implemented
LE0527 # 05 Y:2022 05 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $32,527 $500,000 Implemented
LE0527 # 06 Y:2022 06 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,260 $8,500 Not Implemented
DL0124 # 01 Y:2014 01 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,900 $0 Implemented
DL0124 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $691 $900 Not Implemented
DL0124 # 04 Y:2014 04 2014 INSTALL TIMERS AND/OR THERMOSTATS $700 $180 Not Implemented
DL0124 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,680 $0 Implemented
DL0124 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,125 $0 Implemented
DL0124 # 07 Y:2014 07 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $760 $1,220 Not Implemented
DL0124 # 03 Y:2014 03 2014 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $340 $0 Not Implemented
DL0124 # 02 Y:2014 02 2014 USE OPTIMUM TEMPERATURE $490 $0 Implemented
LE0367 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,165 $16,000 Not Implemented
LE0367 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,516 $1,350 Implemented
LE0367 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,213 $15,750 Implemented