Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
124
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MO0270 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,783 | $36,941 | Implemented |
MO0270 # 04 Y:1999 | 04 | 1999 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $720 | $1,800 | Not Implemented |
MO0270 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,802 | $10,421 | Not Implemented |
MO0270 # 06 Y:1999 | 06 | 1999 | CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY | $4,407 | $0 | Not Implemented |
MO0270 # 05 Y:1999 | 05 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $76,792 | $0 | Not Implemented |
MO0270 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $235 | $53 | Not Implemented |
MA0446 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $30,897 | $36,700 | Not Implemented |
MA0446 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,237 | $3,575 | Implemented |
MA0446 # 06 Y:1999 | 06 | 1999 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,849 | $0 | Implemented |
MA0446 # 09 Y:1999 | 09 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $718 | $2,000 | Not Implemented |
MA0446 # 10 Y:1999 | 10 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $638 | $300 | Implemented |
MA0446 # 08 Y:1999 | 08 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $930 | $4,225 | Not Implemented |
MA0446 # 07 Y:1999 | 07 | 1999 | AIR CONDITION ONLY SPACE NECESSARY | $1,137 | $2,670 | Implemented |
MA0446 # 02 Y:1999 | 02 | 1999 | INSULATE BARE EQUIPMENT | $30,690 | $820 | Not Implemented |
MA0446 # 03 Y:1999 | 03 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $14,463 | $20,800 | Implemented |
MA0446 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,234 | $12,279 | Not Implemented |
CO0453 # 01 Y:1999 | 01 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,250 | $1,380 | Not Implemented |
CO0453 # 06 Y:1999 | 06 | 1999 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $320 | $890 | Not Implemented |
CO0453 # 05 Y:1999 | 05 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $670 | $320 | Not Implemented |
CO0453 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,380 | $2,150 | Not Implemented |
CO0453 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $800 | $240 | Not Implemented |
CO0453 # 02 Y:1999 | 02 | 1999 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,130 | $10,000 | Not Implemented |
CO0452 # 05 Y:1999 | 05 | 1999 | USE A RAG RECYCLE SERVICE | $350 | $0 | n/a |
CO0452 # 07 Y:1999 | 07 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $130 | $0 | n/a |
CO0452 # 01 Y:1999 | 01 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,650 | $5,000 | n/a |