IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

114

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AT0018 # 05 Y:1985 05 1985 INSTALL TIMERS AND/OR THERMOSTATS $9,397 $275 Implemented
AT0018 # 06 Y:1985 06 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $718 $0 Implemented
ST0034 # 06 Y:1985 06 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $150 $0 Implemented
ST0034 # 04 Y:1985 04 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $462 $870 Not Implemented
ST0034 # 11 Y:1985 11 1985 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $942 $78 Not Implemented
MA0037 # 05 Y:1985 05 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,730 $400 Implemented
MA0037 # 07 Y:1985 07 1985 RECOVER WASTE HEAT FROM EQUIPMENT $13,893 $27,500 Not Implemented
MA0037 # 06 Y:1985 06 1985 REPAIR OR REPLACE STEAM TRAPS $3,789 $533 Implemented
ST0034 # 09 Y:1985 09 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,171 $0 Not Implemented
ST0034 # 10 Y:1985 10 1985 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $333 $880 Not Implemented
ST0034 # 03 Y:1985 03 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $330 $0 Implemented
ST0034 # 05 Y:1985 05 1985 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $575 $1,200 Implemented
ST0034 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,370 $639 Not Implemented
ST0034 # 02 Y:1985 02 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,160 $80 Implemented
KU0161 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,195 $3,957 Implemented
KU0161 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $182 $0 Implemented
KU0161 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $49 $40 Implemented
KU0161 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $32 $65 Not Implemented
OK0170 # 05 Y:1985 05 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $232 $200 Implemented
OK0170 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $52 $27 Implemented
ST0024 # 11 Y:1985 11 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,038 $2,186 Implemented
ST0024 # 06 Y:1985 06 1985 INSTALL AUTOMATIC STACK DAMPER $200 $2,550 Not Implemented
ST0024 # 05 Y:1985 05 1985 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $2,549 $3,000 Not Implemented
ST0024 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $893 $112 Implemented
ST0024 # 03 Y:1985 03 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,844 $1,600 Not Implemented