IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

109

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0207 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $123,852 $137,314 Not Implemented
MI0207 # 02 Y:2011 02 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $76,417 $150,000 Not Implemented
MI0207 # 03 Y:2011 03 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $61,926 $2,550 Implemented
MI0207 # 04 Y:2011 04 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $33,207 $8,474 Not Implemented
MI0207 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,901 $1,320 Implemented
MI0207 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,650 $9,200 Not Implemented
DL0067 # 01 Y:2011 01 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $5,600 $3,500 Not Implemented
DL0067 # 02 Y:2011 02 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $4,300 $2,600 Not Implemented
DL0067 # 03 Y:2011 03 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $331 $780 Not Implemented
DL0067 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $5,082 $1,000 Not Implemented
DL0067 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $9,000 $1,500 Not Implemented
DL0067 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $4,518 $3,100 Not Implemented
DL0067 # 07 Y:2011 07 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $16,400 $1,200 Not Implemented
DL0067 # 08 Y:2011 08 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $19,150 $13,200 Not Implemented
MA0667 # 01 Y:2011 01 2011 REDUCE VENTILATION AIR $45,912 $17,705 Not Implemented
MA0667 # 02 Y:2011 02 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $31,118 $100,000 Not Implemented
MA0667 # 03 Y:2011 03 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $11,694 $10,590 Implemented
MA0667 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $8,118 $0 Implemented
MA0667 # 05 Y:2011 05 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,023 $250 Implemented
MA0667 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,246 $3,000 Not Implemented
MA0667 # 07 Y:2011 07 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,047 $17,500 Not Implemented
MA0667 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,129 $6,340 Not Implemented
MA0667 # 09 Y:2011 09 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,515 $4,000 Not Implemented
MA0667 # 10 Y:2011 10 2011 INSTALL AUTOMATIC STACK DAMPER $729 $180 Implemented
MA0667 # 11 Y:2011 11 2011 INSULATE BARE EQUIPMENT $525 $550 Not Implemented