IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

187

matching recommendations
Reset
SIC 381 Search And Navigation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0299 # 02 Y:1997 02 1997 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $17,850 $16,760 Implemented
AM0299 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,500 $29,520 Implemented
AM0299 # 04 Y:1997 04 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,700 $8,000 Implemented
AM0299 # 05 Y:1997 05 1997 ADD AREA LIGHTING SWITCHES $2,070 $560 Implemented
AM0299 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,860 $0 Not Implemented
AM0299 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $1,140 Not Implemented
AM0299 # 08 Y:1997 08 1997 USE SYNTHETIC LUBRICANT $520 $0 Implemented
AM0299 # 09 Y:1997 09 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $290 $200 Implemented
MS0050 # 01 Y:1996 01 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $517 $2,000 Not Implemented
MS0050 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,370 $1,882 Implemented
MS0050 # 03 Y:1996 03 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $14,049 $1,940 Not Implemented
MS0050 # 04 Y:1996 04 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,300 $0 Implemented
MS0050 # 05 Y:1996 05 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $11,500 $6,500 Not Implemented
CO0343 # 01 Y:1995 01 1995 ADD AREA LIGHTING SWITCHES $2,470 $300 Not Implemented
CO0343 # 02 Y:1995 02 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,910 $4,320 Not Implemented
CO0343 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,400 $5,210 Not Implemented
CO0343 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,180 $2,680 Implemented
CO0343 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $980 $900 Implemented
CO0343 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $930 $1,250 Implemented
CO0343 # 07 Y:1995 07 1995 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $170 $0 Not Implemented
WV0055 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,944 $1,558 Implemented
WV0055 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $655 $500 Implemented
WV0055 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $768 $374 Implemented
WV0055 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $589 $760 Implemented
WV0055 # 05 Y:1995 05 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,042 $18,000 Not Implemented