Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews starting with December 31, 2023
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2023, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
Learn More:
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews starting with December 31, 2023
*See Full Grant Solicitation for full qualification and selection details.
1,656
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0542 # 03 Y:2023 | 03 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $651 | $85 | n/a |
SD0644 # 04 Y:2024 | 04 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $3,868 | $8,200 | n/a |
SD0644 # 06 Y:2024 | 06 | 2024 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $61,738 | $0 | n/a |
SU0542 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,596 | $390 | n/a |
SU0542 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,404 | $1,750 | n/a |
SD0644 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $189 | $240 | n/a |
SU0542 # 07 Y:2023 | 07 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,035 | $1,460 | n/a |
SU0542 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $258 | $250 | n/a |
SD0644 # 09 Y:2024 | 09 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $738 | $3,205 | n/a |
SD0644 # 01 Y:2024 | 01 | 2024 | USE PHOTOCELL CONTROLS | $693 | $2,383 | n/a |
SD0644 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $5,961 | $1,050 | n/a |
SU0542 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,088 | $0 | n/a |
SD0644 # 08 Y:2024 | 08 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $7,472 | $0 | n/a |
SD0644 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $108,342 | $141,268 | n/a |
SD0644 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $595 | $1,016 | n/a |
SU0542 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,343 | $4,218 | n/a |
TT0305 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $637 | $125 | n/a |
TT0305 # 04 Y:2024 | 04 | 2024 | AIR CONDITION ONLY SPACE NECESSARY | $6,707 | $1,060 | n/a |
TT0305 # 01 Y:2024 | 01 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $50,976 | $15,000 | n/a |
TT0305 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $12,922 | $5,000 | n/a |
TT0305 # 02 Y:2024 | 02 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $34,931 | $146,400 | n/a |
TT0305 # 08 Y:2024 | 08 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $82 | $174 | n/a |
TT0305 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $212 | $60 | n/a |
TT0305 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,366 | $3,000 | n/a |
SU0539 # 01 Y:2023 | 01 | 2023 | DISCONNECT BALLASTS | $1,626 | $0 | n/a |