Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0527 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,500 | $3,435 | Implemented |
LE0527 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $2,621 | $1,330 | Implemented |
LE0527 # 01 Y:2022 | 01 | 2022 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,805 | $0 | Implemented |
LE0527 # 07 Y:2022 | 07 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,154 | $160,000 | Implemented |
LE0527 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $32,527 | $500,000 | Implemented |
LE0367 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,516 | $1,350 | Implemented |
LE0367 # 03 Y:2013 | 03 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $1,711 | $0 | Implemented |
LE0367 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,213 | $15,750 | Implemented |
LE0234 # 08 Y:2006 | 08 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $593 | $60 | Implemented |
LE0234 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,195 | $3,490 | Implemented |
LE0234 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $5,320 | $1,500 | Implemented |
LE0234 # 05 Y:2006 | 05 | 2006 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $10,090 | $6,000 | Implemented |
LE0234 # 02 Y:2006 | 02 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $46,545 | $3,000 | Implemented |
LE0234 # 01 Y:2006 | 01 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $190,924 | $500,000 | Implemented |
LE0210 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $255 | $80 | Implemented |
LE0210 # 04 Y:2005 | 04 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,330 | $4,866 | Implemented |
LE0210 # 03 Y:2005 | 03 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,616 | $2,000 | Implemented |
LE0210 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,088 | $750 | Implemented |
HO0178 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,430 | $2,149 | Implemented |
HO0178 # 11 Y:1998 | 11 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $20,000 | $2,000 | Implemented |
HO0178 # 10 Y:1998 | 10 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $2,500 | $360 | Implemented |
HO0178 # 08 Y:1998 | 08 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $828 | $0 | Implemented |
HO0178 # 07 Y:1998 | 07 | 1998 | INSULATE BARE EQUIPMENT | $282 | $200 | Implemented |
HO0178 # 06 Y:1998 | 06 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,272 | $1,000 | Implemented |
HO0178 # 04 Y:1998 | 04 | 1998 | INSTALL OCCUPANCY SENSORS | $244 | $200 | Implemented |