Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,723
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0414 # 11 Y:2016 | 11 | 2016 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $153 | $359 | Implemented |
SU0414 # 12 Y:2016 | 12 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,446 | $6,536 | Not Implemented |
UD0951 # 01 Y:2016 | 01 | 2016 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,773 | $0 | Not Implemented |
UD0951 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $3,278 | $1,200 | Not Implemented |
UD0951 # 03 Y:2016 | 03 | 2016 | CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS | $5,257 | $700 | Not Implemented |
UD0951 # 04 Y:2016 | 04 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $780 | $750 | Not Implemented |
UD0951 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $746 | $50 | Not Implemented |
UD0951 # 06 Y:2016 | 06 | 2016 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,332 | $3,750 | Implemented |
DL0162 # 01 Y:2016 | 01 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $22,170 | $0 | Implemented |
DL0162 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,660 | $0 | Implemented |
DL0162 # 03 Y:2016 | 03 | 2016 | REDUCE VENTILATION AIR | $2,430 | $340 | Not Implemented |
DL0162 # 04 Y:2016 | 04 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,605 | $800 | Implemented |
DL0162 # 05 Y:2016 | 05 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,940 | $510 | Not Implemented |
DL0162 # 06 Y:2016 | 06 | 2016 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $18,175 | $10,500 | Implemented |
DL0162 # 07 Y:2016 | 07 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,730 | $1,820 | Implemented |
DL0162 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,930 | $29,230 | Implemented |
SD0524 # 01 Y:2016 | 01 | 2016 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $116,648 | $532,759 | Not Implemented |
SD0524 # 02 Y:2016 | 02 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $69,647 | $181,800 | Not Implemented |
SD0524 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,569 | $4,000 | Not Implemented |
SD0524 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,433 | $30,898 | Not Implemented |
SD0524 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,124 | $7,975 | Implemented |
SD0524 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,814 | $18,199 | Not Implemented |
SD0524 # 07 Y:2016 | 07 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,363 | $800 | Not Implemented |
SD0524 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $3,754 | $1,310 | Implemented |
SD0524 # 09 Y:2016 | 09 | 2016 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $2,073 | $5,877 | Not Implemented |