IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,723

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0414 # 11 Y:2016 11 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $153 $359 Implemented
SU0414 # 12 Y:2016 12 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,446 $6,536 Not Implemented
UD0951 # 01 Y:2016 01 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,773 $0 Not Implemented
UD0951 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $3,278 $1,200 Not Implemented
UD0951 # 03 Y:2016 03 2016 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $5,257 $700 Not Implemented
UD0951 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $780 $750 Not Implemented
UD0951 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $746 $50 Not Implemented
UD0951 # 06 Y:2016 06 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,332 $3,750 Implemented
DL0162 # 01 Y:2016 01 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $22,170 $0 Implemented
DL0162 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,660 $0 Implemented
DL0162 # 03 Y:2016 03 2016 REDUCE VENTILATION AIR $2,430 $340 Not Implemented
DL0162 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,605 $800 Implemented
DL0162 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,940 $510 Not Implemented
DL0162 # 06 Y:2016 06 2016 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $18,175 $10,500 Implemented
DL0162 # 07 Y:2016 07 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,730 $1,820 Implemented
DL0162 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,930 $29,230 Implemented
SD0524 # 01 Y:2016 01 2016 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $116,648 $532,759 Not Implemented
SD0524 # 02 Y:2016 02 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $69,647 $181,800 Not Implemented
SD0524 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,569 $4,000 Not Implemented
SD0524 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,433 $30,898 Not Implemented
SD0524 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,124 $7,975 Implemented
SD0524 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,814 $18,199 Not Implemented
SD0524 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,363 $800 Not Implemented
SD0524 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $3,754 $1,310 Implemented
SD0524 # 09 Y:2016 09 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $2,073 $5,877 Not Implemented