IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,723

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0524 # 10 Y:2016 10 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $954 $2,390 Not Implemented
DL0160 # 01 Y:2016 01 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $25,680 $0 Not Implemented
DL0160 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,550 $0 Implemented
DL0160 # 03 Y:2016 03 2016 REDUCE VENTILATION AIR $32,810 $1,560 Not Implemented
DL0160 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $18,520 $65,650 Not Implemented
DL0160 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,525 $99,395 Not Implemented
DL0160 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,935 $211,395 Implemented
MA0753 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,534 $67,200 Not Implemented
MA0753 # 02 Y:2015 02 2015 REDUCE VENTILATION AIR $7,290 $5,575 Implemented
MA0753 # 03 Y:2015 03 2015 REDUCE VENTILATION AIR $4,632 $6,000 Implemented
MA0753 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,608 $4,608 Implemented
MA0753 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $1,226 $1,400 Implemented
MA0753 # 06 Y:2015 06 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $842 $2,152 Not Implemented
WM0078 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $31,723 $105,982 Not Implemented
WM0078 # 02 Y:2015 02 2015 USE SYNTHETIC LUBRICANT $14,981 $4,505 Not Implemented
WM0078 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $11,162 $18,000 Not Implemented
WM0078 # 04 Y:2015 04 2015 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,083 $3,000 Not Implemented
WM0078 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,459 $11,985 Not Implemented
WM0078 # 06 Y:2015 06 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,749 $8,000 Not Implemented
WM0078 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,708 $400 Not Implemented
WM0078 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,724 $2,584 Not Implemented
WM0078 # 09 Y:2015 09 2015 USE PHOTOCELL CONTROLS $2,082 $2,816 Not Implemented
WM0078 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,824 $1,300 Not Implemented
WM0078 # 11 Y:2015 11 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,156 $300 Not Implemented
WM0078 # 12 Y:2015 12 2015 INSTALL OCCUPANCY SENSORS $1,006 $1,500 Not Implemented