Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,763
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0430 # 10 Y:2003 | 10 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $180 | $0 | Implemented |
SD0311 # 01 Y:2003 | 01 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,146 | $19,000 | Not Implemented |
SD0311 # 02 Y:2003 | 02 | 2003 | USE PHOTOCELL CONTROLS | $3,064 | $2,000 | Implemented |
SD0311 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $501 | $0 | Implemented |
SD0311 # 04 Y:2003 | 04 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,622 | $5,000 | Implemented |
SD0311 # 05 Y:2003 | 05 | 2003 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $31,104 | $0 | Not Implemented |
UM0219 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $78,674 | $26,400 | n/a |
UM0219 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,965 | $62,826 | Implemented |
UM0219 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $283 | $225 | Implemented |
UM0219 # 04 Y:2002 | 04 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $431 | $600 | Not Implemented |
UM0219 # 05 Y:2002 | 05 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,258 | $800 | Implemented |
UM0219 # 06 Y:2002 | 06 | 2002 | REPLACE BOILER | $3,920 | $12,000 | Implemented |
UM0219 # 07 Y:2002 | 07 | 2002 | RECOVER AND REUSE COOLING WATER | $8,640 | $5,940 | Implemented |
CO0504 # 01 Y:2002 | 01 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,040 | $7,000 | Implemented |
CO0504 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,250 | $1,950 | Implemented |
CO0504 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $371 | $0 | Implemented |
CO0504 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $44 | $44 | Implemented |
SF0231 # 01 Y:2002 | 01 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $8,403 | $913 | n/a |
SF0231 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,732 | $4,138 | n/a |
SF0231 # 03 Y:2002 | 03 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $20,883 | $15,071 | n/a |
SF0231 # 04 Y:2002 | 04 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,328 | $42,988 | n/a |
SF0231 # 05 Y:2002 | 05 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,557 | $20,529 | n/a |
SF0231 # 06 Y:2002 | 06 | 2002 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $2,391 | $2,193 | n/a |
SF0231 # 07 Y:2002 | 07 | 2002 | SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM | $5,916 | $5,753 | n/a |
SF0231 # 08 Y:2002 | 08 | 2002 | USE PHOTOCELL CONTROLS | $7,529 | $8,040 | n/a |