Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,723
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0619 # 02 Y:2021 | 02 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,715 | $4,000 | Not Implemented |
SD0619 # 03 Y:2021 | 03 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,606 | $387,000 | Not Implemented |
MI0379 # 01 Y:2020 | 01 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $192,230 | $217,000 | Implemented |
MI0379 # 02 Y:2020 | 02 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,551 | $2,080 | Not Implemented |
MI0379 # 03 Y:2020 | 03 | 2020 | USE SOLAR HEAT TO HEAT WATER | $9,075 | $12,000 | Not Implemented |
MI0379 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,846 | $1,980 | Not Implemented |
MI0379 # 05 Y:2020 | 05 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,953 | $5,914 | Not Implemented |
MI0379 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,317 | $2,100 | Not Implemented |
CO0739 # 01 Y:2020 | 01 | 2020 | INSTALL OCCUPANCY SENSORS | $5,400 | $11,069 | Not Implemented |
CO0739 # 02 Y:2020 | 02 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,357 | $12,500 | Not Implemented |
CO0739 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $291 | $185 | Implemented |
CO0739 # 04 Y:2020 | 04 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,067 | $0 | Implemented |
CO0739 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $1,541 | $3,605 | Not Implemented |
CO0739 # 06 Y:2020 | 06 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,090 | $0 | Implemented |
MZ0288 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,689 | $41,089 | Not Implemented |
MZ0288 # 02 Y:2020 | 02 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,118 | $3,400 | Not Implemented |
MZ0288 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,574 | $1,660 | Not Implemented |
MZ0288 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,502 | $3,320 | Not Implemented |
MZ0288 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $424 | $430 | Not Implemented |
SU0499 # 01 Y:2020 | 01 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,584 | $534 | Implemented |
SU0499 # 02 Y:2020 | 02 | 2020 | REDUCE VENTILATION AIR | $2,636 | $882 | Implemented |
SU0499 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,448 | $4,525 | Implemented |
SU0499 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $627 | $999 | Not Implemented |
SU0499 # 05 Y:2020 | 05 | 2020 | ELIMINATE/REDUCE AN OPERATION | $6,889 | $11,879 | Implemented |
SU0499 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,223 | $75,235 | Implemented |