Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
79
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0446 # 06 Y:1999 | 06 | 1999 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,849 | $0 | Implemented |
MA0446 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,234 | $12,279 | Not Implemented |
MA0446 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,237 | $3,575 | Implemented |
MA0446 # 03 Y:1999 | 03 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $14,463 | $20,800 | Implemented |
MA0446 # 02 Y:1999 | 02 | 1999 | INSULATE BARE EQUIPMENT | $30,690 | $820 | Not Implemented |
MA0446 # 09 Y:1999 | 09 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $718 | $2,000 | Not Implemented |
MA0446 # 10 Y:1999 | 10 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $638 | $300 | Implemented |
MA0446 # 08 Y:1999 | 08 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $930 | $4,225 | Not Implemented |
MA0446 # 07 Y:1999 | 07 | 1999 | AIR CONDITION ONLY SPACE NECESSARY | $1,137 | $2,670 | Implemented |
MA0446 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $30,897 | $36,700 | Not Implemented |
CO0453 # 02 Y:1999 | 02 | 1999 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,130 | $10,000 | Not Implemented |
CO0453 # 06 Y:1999 | 06 | 1999 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $320 | $890 | Not Implemented |
CO0453 # 05 Y:1999 | 05 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $670 | $320 | Not Implemented |
CO0453 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $800 | $240 | Not Implemented |
CO0453 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,380 | $2,150 | Not Implemented |
CO0453 # 01 Y:1999 | 01 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,250 | $1,380 | Not Implemented |
CO0452 # 07 Y:1999 | 07 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $130 | $0 | n/a |
CO0452 # 02 Y:1999 | 02 | 1999 | REDUCE VENTILATION AIR | $1,860 | $1,000 | n/a |
CO0452 # 01 Y:1999 | 01 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,650 | $5,000 | n/a |
CO0452 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10 | $0 | n/a |
CO0452 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $310 | $290 | n/a |
CO0452 # 05 Y:1999 | 05 | 1999 | USE A RAG RECYCLE SERVICE | $350 | $0 | n/a |
CO0452 # 06 Y:1999 | 06 | 1999 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $140 | $0 | n/a |
WI0359 # 03 Y:1999 | 03 | 1999 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $2,831 | $0 | Not Implemented |
WI0359 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,067 | $1,000 | Not Implemented |