IAC Assessment: WI0359
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0359
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1999
Principal Product Boiler Controls
NAICS n/a
SIC 3823 - Process Control Instruments
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 150,000
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $122,367 2,940,211 kWh $0.04
Electricity Demand $98,119 7,851 kW-months/year $12.50
Electricity Fees $35,105 - $ -
Natural Gas $59,954 14,420 MMBtu $4.16
TOTAL ENERGY COSTS $344,903
RECOMMENDED SAVINGS* $23,323 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,522
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
01: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$6,185
Cost:
$7,500
- - - - - - $8,505 605 $(-359) (-203) $(-726) - $(-1,235) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,505
605
gal
$(-359)
(-203)
lb
$(-726)
-
$
$(-1,235)
-
$
-
-
$
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$5,455
Cost:
$24,000
$9,651 212,192 $9,186 672 $(-13,382) (-3,217) - - - - - - - - - - $9,651
212,192
kWh
$9,186
672
kW-months/year
$(-13,382)
(-3,217)
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$2,831
Cost:
-
- - $7,556 378 - - - - - - $(-4,725) - - - - - -
-
kWh
$7,556
378
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$(-4,725)
-
$
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,067
Cost:
$1,000
- - - - $2,067 497 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,067
497
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,815
Cost:
$100
$1,224 26,964 $591 43 - - - - - - - - - - - - $1,224
26,964
kWh
$591
43
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,781
Cost:
-
$1,289 28,429 $492 36 - - - - - - - - - - - - $1,289
28,429
kWh
$492
36
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$1,391
Cost:
$500
- - - - $1,391 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,391
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
08: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$872
Cost:
$1,000
- - - - - - - - - - - - - - $872 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
$872
-
$
09: 2.7314 REDUCE VENTILATION AIR Savings:
$648
Cost:
$500
$68 1,465 - - $580 139 - - - - - - - - - - $68
1,465
kWh
-
-
kW-months/year
$580
139
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$278
Cost:
-
$141 3,224 $137 10 - - - - - - - - - - - - $141
3,224
kWh
$137
10
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$23,323
Cost:
$34,600
$12,373 272,274 $17,962 1,139 $(-9,344) (-2,581) $8,505 605 $(-359) (-203) $(-5,451) - $(-1,235) - $872 - $12,373
272,274
kWh
$17,962
1,139
kW-months/year
$(-9,344)
(-2,581)
MMBtu
$8,505
605
gal
$(-359)
(-203)
lb
$(-5,451)
-
$
$(-1,235)
-
$
$872
-
$
TOTAL IMPLEMENTED Savings:
$4,522
Cost:
$600
$2,722 60,082 $1,220 89 $580 139 - - - - - - - - - - $2,722
60,082
kWh
$1,220
89
kW-months/year
$580
139
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost