IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0576 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,505 $4,283 Implemented
MA0576 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,578 $7,342 Implemented
MA0576 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,240 $3,120 Implemented
MA0576 # 01 Y:2005 01 2005 INSTALL TIMERS AND/OR THERMOSTATS $33,608 $2,000 Not Implemented
LE0210 # 07 Y:2005 07 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $147 $360 Not Implemented
LE0210 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $255 $80 Implemented
LE0210 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $366 $140 Not Implemented
LE0210 # 04 Y:2005 04 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,330 $4,866 Implemented
LE0210 # 03 Y:2005 03 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,616 $2,000 Implemented
LE0210 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,088 $750 Implemented
LE0210 # 01 Y:2005 01 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,350 $6,560 Not Implemented
UD0713 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,925 $200 Implemented
UD0713 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $1,021 $3,807 Implemented
UD0713 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,868 $22,600 Not Implemented
UD0713 # 04 Y:2005 04 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $15,628 $3,900 Not Implemented
UD0713 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,435 $41,783 Implemented
UD0713 # 02 Y:2005 02 2005 USE OPTIMUM TEMPERATURE $64,754 $2,500 Not Implemented
UD0713 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84,867 $94,373 Not Implemented
NC0310 # 01 Y:2005 01 2005 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $167,500 $150,000 Implemented
NC0310 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $339 $616 Not Implemented
NC0310 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,830 $875 Implemented
NC0310 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,451 $3,000 Implemented
NC0310 # 04 Y:2005 04 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $34,863 $30,000 Not Implemented
NC0310 # 03 Y:2005 03 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $60,000 $20,500 Implemented
NC0310 # 02 Y:2005 02 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $97,500 $61,250 Implemented