Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0576 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,505 | $4,283 | Implemented |
MA0576 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,578 | $7,342 | Implemented |
MA0576 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,240 | $3,120 | Implemented |
MA0576 # 01 Y:2005 | 01 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $33,608 | $2,000 | Not Implemented |
LE0210 # 07 Y:2005 | 07 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $147 | $360 | Not Implemented |
LE0210 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $255 | $80 | Implemented |
LE0210 # 05 Y:2005 | 05 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $366 | $140 | Not Implemented |
LE0210 # 04 Y:2005 | 04 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,330 | $4,866 | Implemented |
LE0210 # 03 Y:2005 | 03 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,616 | $2,000 | Implemented |
LE0210 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,088 | $750 | Implemented |
LE0210 # 01 Y:2005 | 01 | 2005 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,350 | $6,560 | Not Implemented |
UD0713 # 06 Y:2005 | 06 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,925 | $200 | Implemented |
UD0713 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,021 | $3,807 | Implemented |
UD0713 # 05 Y:2005 | 05 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,868 | $22,600 | Not Implemented |
UD0713 # 04 Y:2005 | 04 | 2005 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $15,628 | $3,900 | Not Implemented |
UD0713 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,435 | $41,783 | Implemented |
UD0713 # 02 Y:2005 | 02 | 2005 | USE OPTIMUM TEMPERATURE | $64,754 | $2,500 | Not Implemented |
UD0713 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $84,867 | $94,373 | Not Implemented |
NC0310 # 01 Y:2005 | 01 | 2005 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $167,500 | $150,000 | Implemented |
NC0310 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $339 | $616 | Not Implemented |
NC0310 # 06 Y:2005 | 06 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,830 | $875 | Implemented |
NC0310 # 05 Y:2005 | 05 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,451 | $3,000 | Implemented |
NC0310 # 04 Y:2005 | 04 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $34,863 | $30,000 | Not Implemented |
NC0310 # 03 Y:2005 | 03 | 2005 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $60,000 | $20,500 | Implemented |
NC0310 # 02 Y:2005 | 02 | 2005 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $97,500 | $61,250 | Implemented |