Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0542 # 07 Y:2023 | 07 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,035 | $1,460 | n/a |
SU0542 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $258 | $250 | n/a |
SU0542 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,343 | $4,218 | n/a |
SU0542 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,404 | $1,750 | n/a |
SU0542 # 03 Y:2023 | 03 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $651 | $85 | n/a |
SU0542 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,088 | $0 | n/a |
SU0542 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,596 | $390 | n/a |
SU0539 # 01 Y:2023 | 01 | 2023 | DISCONNECT BALLASTS | $1,626 | $0 | n/a |
SU0539 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $10,262 | $5,600 | n/a |
SU0539 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,866 | $1,925 | n/a |
SU0539 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,490 | $11,867 | n/a |
DL0229 # 05 Y:2023 | 05 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,948 | $14,000 | n/a |
DL0229 # 04 Y:2023 | 04 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $44,923 | $1,275 | n/a |
DL0229 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM TEMPERATURE | $8,303 | $0 | n/a |
DL0229 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $32,353 | $0 | n/a |
DL0229 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $61,397 | $0 | n/a |
DL0229 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $104,868 | $500,000 | n/a |
MI0423 # 08 Y:2023 | 08 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,131 | $1,500 | Implemented |
MI0423 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $4,508 | $1,250 | Implemented |
MI0423 # 06 Y:2023 | 06 | 2023 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $6,580 | $1,455 | Not Implemented |
MI0423 # 05 Y:2023 | 05 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,196 | $27,500 | Not Implemented |
MI0423 # 04 Y:2023 | 04 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,785 | $37,678 | Implemented |
MI0423 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,808 | $580 | Implemented |
MI0423 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,513 | $51,984 | Implemented |
MI0423 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $41,834 | $0 | Implemented |