Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0021 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,396 | $15,000 | n/a |
CC0021 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,760 | $0 | n/a |
CC0021 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,174 | $0 | n/a |
CC0021 # 07 Y:2023 | 07 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,928 | $5,000 | n/a |
CC0021 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,378 | $25,947 | n/a |
CC0021 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,085 | $35,000 | n/a |
CC0021 # 01 Y:2023 | 01 | 2023 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $50,657 | $5,000 | n/a |
SU0542 # 07 Y:2023 | 07 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,035 | $1,460 | Not Implemented |
SU0542 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $258 | $250 | Implemented |
SU0542 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,343 | $4,218 | Implemented |
SU0542 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,404 | $1,750 | Implemented |
SU0542 # 03 Y:2023 | 03 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $651 | $85 | Implemented |
SU0542 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,596 | $390 | Not Implemented |
SU0542 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,088 | $0 | Not Implemented |
SU0539 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $10,262 | $5,600 | n/a |
SU0539 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,490 | $11,867 | n/a |
SU0539 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,866 | $1,925 | n/a |
SU0539 # 01 Y:2023 | 01 | 2023 | DISCONNECT BALLASTS | $1,626 | $0 | n/a |
DL0229 # 05 Y:2023 | 05 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,948 | $14,000 | Not Implemented |
DL0229 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM TEMPERATURE | $8,303 | $0 | Not Implemented |
DL0229 # 04 Y:2023 | 04 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $44,923 | $1,275 | Not Implemented |
DL0229 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $32,353 | $0 | Implemented |
DL0229 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $61,397 | $0 | Not Implemented |
DL0229 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $104,868 | $500,000 | Not Implemented |
MI0423 # 05 Y:2023 | 05 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,196 | $27,500 | Not Implemented |