Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
157
matching recommendationsSIC | 3821 | Laboratory Apparatus And Furniture |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0270 # 07 Y:2015 | 07 | 2015 | USE OPTIMUM THICKNESS INSULATION | $3,506 | $1,140 | Implemented |
MI0270 # 08 Y:2015 | 08 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,926 | $7,869 | Implemented |
MI0270 # 09 Y:2015 | 09 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,351 | $3,960 | Not Implemented |
MI0270 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,546 | $5,294 | Implemented |
MI0270 # 11 Y:2015 | 11 | 2015 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,475 | $560 | Not Implemented |
MI0270 # 12 Y:2015 | 12 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,467 | $1,660 | Implemented |
MI0270 # 13 Y:2015 | 13 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,282 | $645 | Not Implemented |
MI0270 # 14 Y:2015 | 14 | 2015 | INSTALL OCCUPANCY SENSORS | $1,131 | $1,220 | Not Implemented |
MI0270 # 15 Y:2015 | 15 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $970 | $80 | Implemented |
LE0367 # 03 Y:2013 | 03 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $1,711 | $0 | Implemented |
LE0367 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,213 | $15,750 | Implemented |
LE0367 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,354 | $9,800 | Not Implemented |
LE0367 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,606 | $15,100 | Not Implemented |
LE0367 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,516 | $1,350 | Implemented |
LE0367 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,165 | $16,000 | Not Implemented |
LE0367 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,499 | $990 | Not Implemented |
LE0367 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,515 | $500 | Not Implemented |
SF0331 # 03 Y:2006 | 03 | 2006 | OPTIMIZE PLANT POWER FACTOR | $3,422 | $1,950 | Not Implemented |
SF0331 # 02 Y:2006 | 02 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $16,440 | $3,828 | Implemented |
SF0331 # 01 Y:2006 | 01 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,466 | $169 | Implemented |
SF0331 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $371 | $888 | Implemented |
SF0331 # 07 Y:2006 | 07 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $885 | $2,838 | Not Implemented |
SF0331 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,020 | $2,819 | Not Implemented |
SF0331 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,535 | $4,389 | Implemented |
NC0310 # 03 Y:2005 | 03 | 2005 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $60,000 | $20,500 | Implemented |