Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
90
matching recommendationsSIC | 3821 | Laboratory Apparatus And Furniture |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0331 # 03 Y:2006 | 03 | 2006 | OPTIMIZE PLANT POWER FACTOR | $3,422 | $1,950 | Not Implemented |
SF0331 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $371 | $888 | Implemented |
SF0331 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,535 | $4,389 | Implemented |
SF0331 # 01 Y:2006 | 01 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,466 | $169 | Implemented |
SF0331 # 02 Y:2006 | 02 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $16,440 | $3,828 | Implemented |
SF0331 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,020 | $2,819 | Not Implemented |
SF0331 # 07 Y:2006 | 07 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $885 | $2,838 | Not Implemented |
NC0310 # 02 Y:2005 | 02 | 2005 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $97,500 | $61,250 | Implemented |
NC0310 # 03 Y:2005 | 03 | 2005 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $60,000 | $20,500 | Implemented |
NC0310 # 06 Y:2005 | 06 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,830 | $875 | Implemented |
NC0310 # 08 Y:2005 | 08 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $509 | $100 | Implemented |
NC0310 # 05 Y:2005 | 05 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,451 | $3,000 | Implemented |
NC0310 # 04 Y:2005 | 04 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $34,863 | $30,000 | Not Implemented |
NC0310 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $339 | $616 | Not Implemented |
NC0310 # 01 Y:2005 | 01 | 2005 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $167,500 | $150,000 | Implemented |
NC0307 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,171 | $100 | Implemented |
NC0307 # 01 Y:2004 | 01 | 2004 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $151,225 | $150,000 | Not Implemented |
NC0307 # 03 Y:2004 | 03 | 2004 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $32,361 | $24,000 | Not Implemented |
NC0307 # 02 Y:2004 | 02 | 2004 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $72,400 | $49,500 | Implemented |
NC0307 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,342 | $1,456 | Not Implemented |
NC0307 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,989 | $31,278 | Not Implemented |
NC0307 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $313 | $381 | Not Implemented |
KU0554 # 05 Y:2000 | 05 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $620 | $2,000 | Not Implemented |
KU0554 # 04 Y:2000 | 04 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,445 | $0 | Implemented |
KU0554 # 02 Y:2000 | 02 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,829 | $0 | Implemented |