IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

413

matching recommendations
Reset
SIC 3823 Process Control Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0644 # 06 Y:2024 06 2024 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $61,738 $0 n/a
SU0542 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $250 n/a
SU0542 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,404 $1,750 n/a
SD0644 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $108,342 $141,268 n/a
SD0644 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $189 $240 n/a
SD0644 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $595 $1,016 n/a
SD0644 # 09 Y:2024 09 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $738 $3,205 n/a
SU0542 # 07 Y:2023 07 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,035 $1,460 n/a
SD0644 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $5,961 $1,050 n/a
SU0542 # 03 Y:2023 03 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $651 $85 n/a
SU0542 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,088 $0 n/a
SD0644 # 01 Y:2024 01 2024 USE PHOTOCELL CONTROLS $693 $2,383 n/a
SD0644 # 08 Y:2024 08 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $7,472 $0 n/a
SD0644 # 04 Y:2024 04 2024 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $3,868 $8,200 n/a
SU0542 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,343 $4,218 n/a
SU0542 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,596 $390 n/a
SU0539 # 01 Y:2023 01 2023 DISCONNECT BALLASTS $1,626 $0 n/a
SU0539 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,866 $1,925 n/a
SU0539 # 02 Y:2023 02 2023 REDUCE VENTILATION AIR $10,262 $5,600 n/a
SU0539 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,490 $11,867 n/a
DL0206 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,447 $8,852 Implemented
DL0206 # 01 Y:2022 01 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $917 $0 Implemented
DL0206 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,292 $0 Implemented
DL0206 # 04 Y:2022 04 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,028 $27,352 Implemented
DL0206 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $1,866 $0 Not Implemented