IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 3823 Process Control Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0868 # 13 Y:2013 13 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $33,598 $0 Implemented
OK0868 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,457 $13,371 Implemented
OK0868 # 09 Y:2013 09 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $287 $456 Implemented
OK0868 # 07 Y:2013 07 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $7,022 $1,140 Implemented
OK0868 # 06 Y:2013 06 2013 INSTALL SET-BACK TIMERS $3,871 $606 Implemented
OK0868 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,792 $1,851 Implemented
OK0868 # 03 Y:2013 03 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,572 $7,700 Implemented
OK0868 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,347 $750 Implemented
AM0430 # 10 Y:2003 10 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $180 $0 Implemented
AM0430 # 07 Y:2003 07 2003 REUSE RAGS UNTIL COMPLETELY SOILED $795 $0 Implemented
AM0430 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $850 $77 Implemented
AM0430 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,300 $0 Implemented
AM0430 # 04 Y:2003 04 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,840 $700 Implemented
AM0069 # 01 Y:1989 01 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,260 $47,700 Implemented
AM0070 # 05 Y:1989 05 1989 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $120 $0 Implemented
AM0070 # 03 Y:1989 03 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $175 $250 Implemented
AM0069 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,360 $1,000 Implemented
AM0069 # 03 Y:1989 03 1989 INSTALL SET-BACK TIMERS $4,240 $0 Implemented