IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 3825 Instruments To Measure Electricity
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0524 # 10 Y:2016 10 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $954 $2,390 Not Implemented
SD0524 # 09 Y:2016 09 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $2,073 $5,877 Not Implemented
SD0524 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $3,754 $1,310 Implemented
SD0524 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,363 $800 Not Implemented
SD0524 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,814 $18,199 Not Implemented
SD0524 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,124 $7,975 Implemented
SD0524 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,433 $30,898 Not Implemented
SD0524 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,569 $4,000 Not Implemented
SD0524 # 02 Y:2016 02 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $69,647 $181,800 Not Implemented
SD0524 # 01 Y:2016 01 2016 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $116,648 $532,759 Not Implemented
LM0071 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $80,552 $121,600 Not Implemented
LM0071 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,818 $1,176 Not Implemented
LM0071 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,163 $945 Implemented
LM0071 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $1,330 $1,200 Implemented
LM0071 # 05 Y:2004 05 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,879 $0 Implemented
LM0071 # 06 Y:2004 06 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $99,668 $24,000 Not Implemented
LM0071 # 07 Y:2004 07 2004 MODIFY CURRENT INCENTIVE PROGRAM $3,000 $300 Implemented
LM0071 # 08 Y:2004 08 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $214,912 $3,000 Not Implemented
LM0071 # 09 Y:2004 09 2004 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $252,500 $35,000 Not Implemented
LM0071 # 10 Y:2004 10 2004 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $84,322 $100,000 Implemented
SD0311 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $501 $0 Implemented
SD0311 # 05 Y:2003 05 2003 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $31,104 $0 Not Implemented
SD0311 # 04 Y:2003 04 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,622 $5,000 Implemented
SD0311 # 02 Y:2003 02 2003 USE PHOTOCELL CONTROLS $3,064 $2,000 Implemented
SD0311 # 01 Y:2003 01 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,146 $19,000 Not Implemented