Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
132
matching recommendationsSIC | 3825 | Instruments To Measure Electricity |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0524 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,433 | $30,898 | Not Implemented |
SD0524 # 09 Y:2016 | 09 | 2016 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $2,073 | $5,877 | Not Implemented |
SD0524 # 02 Y:2016 | 02 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $69,647 | $181,800 | Not Implemented |
SD0524 # 01 Y:2016 | 01 | 2016 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $116,648 | $532,759 | Not Implemented |
SD0524 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,569 | $4,000 | Not Implemented |
LM0071 # 10 Y:2004 | 10 | 2004 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $84,322 | $100,000 | Implemented |
LM0071 # 09 Y:2004 | 09 | 2004 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $252,500 | $35,000 | Not Implemented |
LM0071 # 01 Y:2004 | 01 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,818 | $1,176 | Not Implemented |
LM0071 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $80,552 | $121,600 | Not Implemented |
LM0071 # 03 Y:2004 | 03 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,163 | $945 | Implemented |
LM0071 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $1,330 | $1,200 | Implemented |
LM0071 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,879 | $0 | Implemented |
LM0071 # 06 Y:2004 | 06 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $99,668 | $24,000 | Not Implemented |
LM0071 # 07 Y:2004 | 07 | 2004 | MODIFY CURRENT INCENTIVE PROGRAM | $3,000 | $300 | Implemented |
LM0071 # 08 Y:2004 | 08 | 2004 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $214,912 | $3,000 | Not Implemented |
AS0354 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,103 | $9,525 | Not Implemented |
AS0354 # 02 Y:2003 | 02 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,258 | $136 | Not Implemented |
AS0354 # 03 Y:2003 | 03 | 2003 | INSTALL OCCUPANCY SENSORS | $756 | $825 | Not Implemented |
AS0354 # 04 Y:2003 | 04 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $779 | $0 | Not Implemented |
AS0354 # 05 Y:2003 | 05 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,918 | $4,500 | Implemented |
AS0354 # 06 Y:2003 | 06 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $117 | $60 | Implemented |
AS0354 # 07 Y:2003 | 07 | 2003 | USE SYNTHETIC LUBRICANT | $352 | $174 | Not Implemented |
AS0354 # 08 Y:2003 | 08 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,467 | $1,500 | Not Implemented |
AS0354 # 09 Y:2003 | 09 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $271 | $430 | Not Implemented |
SD0311 # 01 Y:2003 | 01 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,146 | $19,000 | Not Implemented |