Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
132
matching recommendationsSIC | 3825 | Instruments To Measure Electricity |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0311 # 02 Y:2003 | 02 | 2003 | USE PHOTOCELL CONTROLS | $3,064 | $2,000 | Implemented |
SD0311 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $501 | $0 | Implemented |
SD0311 # 04 Y:2003 | 04 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,622 | $5,000 | Implemented |
SD0311 # 05 Y:2003 | 05 | 2003 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $31,104 | $0 | Not Implemented |
NV0167 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,639 | $200 | Implemented |
NV0167 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $414 | $50 | Implemented |
NV0167 # 03 Y:2000 | 03 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $229 | $0 | Not Implemented |
NV0167 # 04 Y:2000 | 04 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $3,315 | $680 | Not Implemented |
KU0548 # 01 Y:2000 | 01 | 2000 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $13,917 | $0 | n/a |
KU0548 # 02 Y:2000 | 02 | 2000 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,154 | $11,500 | n/a |
KU0548 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,963 | $1,505 | n/a |
KU0548 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,604 | $40 | n/a |
KU0548 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,422 | $1,050 | n/a |
KU0548 # 06 Y:2000 | 06 | 2000 | MINIMIZE WATER USAGE | $4,075 | $4,075 | n/a |
MA0446 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $30,897 | $36,700 | Not Implemented |
MA0446 # 02 Y:1999 | 02 | 1999 | INSULATE BARE EQUIPMENT | $30,690 | $820 | Not Implemented |
MA0446 # 03 Y:1999 | 03 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $14,463 | $20,800 | Implemented |
MA0446 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,237 | $3,575 | Implemented |
MA0446 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,234 | $12,279 | Not Implemented |
MA0446 # 06 Y:1999 | 06 | 1999 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,849 | $0 | Implemented |
MA0446 # 07 Y:1999 | 07 | 1999 | AIR CONDITION ONLY SPACE NECESSARY | $1,137 | $2,670 | Implemented |
MA0446 # 08 Y:1999 | 08 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $930 | $4,225 | Not Implemented |
MA0446 # 09 Y:1999 | 09 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $718 | $2,000 | Not Implemented |
MA0446 # 10 Y:1999 | 10 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $638 | $300 | Implemented |
ME0260 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,561 | $11,150 | Not Implemented |