Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews starting with December 31, 2023
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2023, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
Learn More:
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews starting with December 31, 2023
*See Full Grant Solicitation for full qualification and selection details.
221
matching recommendationsSIC | 3826 | Analytical Instruments |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0305 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $12,922 | $5,000 | n/a |
TT0305 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,366 | $3,000 | n/a |
TT0305 # 04 Y:2024 | 04 | 2024 | AIR CONDITION ONLY SPACE NECESSARY | $6,707 | $1,060 | n/a |
TT0305 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $212 | $60 | n/a |
TT0305 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $637 | $125 | n/a |
TT0305 # 02 Y:2024 | 02 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $34,931 | $146,400 | n/a |
TT0305 # 01 Y:2024 | 01 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $50,976 | $15,000 | n/a |
TT0305 # 08 Y:2024 | 08 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $82 | $174 | n/a |
DL0229 # 05 Y:2023 | 05 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,948 | $14,000 | n/a |
DL0229 # 04 Y:2023 | 04 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $44,923 | $1,275 | n/a |
DL0229 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM TEMPERATURE | $8,303 | $0 | n/a |
DL0229 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $32,353 | $0 | n/a |
DL0229 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $61,397 | $0 | n/a |
DL0229 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $104,868 | $500,000 | n/a |
MI0421 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $61,330 | $1,580 | Not Implemented |
MI0421 # 10 Y:2023 | 10 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $670 | $1,980 | Implemented |
MI0421 # 08 Y:2023 | 08 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,009 | $0 | Implemented |
MI0421 # 07 Y:2023 | 07 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,466 | $1,492 | Implemented |
MI0421 # 04 Y:2023 | 04 | 2023 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $51,887 | $23,900 | Not Implemented |
MI0421 # 02 Y:2023 | 02 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $92,381 | $7,860 | Not Implemented |
MI0421 # 06 Y:2023 | 06 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $47,137 | $1,580 | Not Implemented |
MI0421 # 05 Y:2023 | 05 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $49,124 | $120 | Implemented |
MI0421 # 09 Y:2023 | 09 | 2023 | INSTALL OCCUPANCY SENSORS | $2,695 | $1,365 | Implemented |
MI0421 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $281,585 | $342,472 | Not Implemented |
SD0619 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,059 | $4,547 | Implemented |