IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

315

matching recommendations
Reset
SIC 3829 Measuring & Controlling Devices, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0441 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $5,725 $23,868 Not Implemented
SF0441 # 04 Y:2013 04 2013 COMBINE UTILITY METERS $1,679 $3,085 Not Implemented
SF0441 # 05 Y:2013 05 2013 USE SOLAR HEAT TO MAKE ELECTRICTY $46,828 $377,867 Not Implemented
AM0637 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,130 $5,300 Not Implemented
AM0637 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $315 $350 Not Implemented
AM0637 # 08 Y:2013 08 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $260 $0 Not Implemented
AM0637 # 09 Y:2013 09 2013 USE SYNTHETIC LUBRICANT $146 $0 Not Implemented
AM0637 # 01 Y:2013 01 2013 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $14,820 $400 Not Implemented
AM0637 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $960 $15 Not Implemented
AM0637 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,500 $260 Not Implemented
AM0637 # 04 Y:2013 04 2013 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,790 $4,250 Not Implemented
AM0637 # 03 Y:2013 03 2013 INSTALL SKYLIGHTS $4,110 $6,350 Not Implemented
SD0439 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,054 $100 Not Implemented
SD0439 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,678 $700 Not Implemented
SD0439 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,510 $5,375 Not Implemented
SD0439 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,851 $8,326 Not Implemented
SD0439 # 05 Y:2011 05 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $110,990 $185,200 Not Implemented
SD0439 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $163,156 $302,600 Not Implemented
SD0438 # 02 Y:2011 02 2011 COVER OPEN TANKS $36,210 $16,850 Not Implemented
SD0438 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,004 $300 Implemented
SD0438 # 03 Y:2011 03 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,445 $1,530 Not Implemented
SD0438 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $28,654 $53,450 Not Implemented
SD0438 # 05 Y:2011 05 2011 OPTIMIZE PLANT POWER FACTOR $12,712 $37,600 Implemented
SD0438 # 06 Y:2011 06 2011 INSTALL SKYLIGHTS $8,562 $25,530 Not Implemented
MA0667 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,129 $6,340 Not Implemented