Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
315
matching recommendationsSIC | 3829 | Measuring & Controlling Devices, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0441 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $5,725 | $23,868 | Not Implemented |
SF0441 # 04 Y:2013 | 04 | 2013 | COMBINE UTILITY METERS | $1,679 | $3,085 | Not Implemented |
SF0441 # 05 Y:2013 | 05 | 2013 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,828 | $377,867 | Not Implemented |
AM0637 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,130 | $5,300 | Not Implemented |
AM0637 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $315 | $350 | Not Implemented |
AM0637 # 08 Y:2013 | 08 | 2013 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $260 | $0 | Not Implemented |
AM0637 # 09 Y:2013 | 09 | 2013 | USE SYNTHETIC LUBRICANT | $146 | $0 | Not Implemented |
AM0637 # 01 Y:2013 | 01 | 2013 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $14,820 | $400 | Not Implemented |
AM0637 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $960 | $15 | Not Implemented |
AM0637 # 05 Y:2013 | 05 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,500 | $260 | Not Implemented |
AM0637 # 04 Y:2013 | 04 | 2013 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,790 | $4,250 | Not Implemented |
AM0637 # 03 Y:2013 | 03 | 2013 | INSTALL SKYLIGHTS | $4,110 | $6,350 | Not Implemented |
SD0439 # 01 Y:2011 | 01 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,054 | $100 | Not Implemented |
SD0439 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,678 | $700 | Not Implemented |
SD0439 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,510 | $5,375 | Not Implemented |
SD0439 # 04 Y:2011 | 04 | 2011 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,851 | $8,326 | Not Implemented |
SD0439 # 05 Y:2011 | 05 | 2011 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $110,990 | $185,200 | Not Implemented |
SD0439 # 06 Y:2011 | 06 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $163,156 | $302,600 | Not Implemented |
SD0438 # 02 Y:2011 | 02 | 2011 | COVER OPEN TANKS | $36,210 | $16,850 | Not Implemented |
SD0438 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,004 | $300 | Implemented |
SD0438 # 03 Y:2011 | 03 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,445 | $1,530 | Not Implemented |
SD0438 # 04 Y:2011 | 04 | 2011 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $28,654 | $53,450 | Not Implemented |
SD0438 # 05 Y:2011 | 05 | 2011 | OPTIMIZE PLANT POWER FACTOR | $12,712 | $37,600 | Implemented |
SD0438 # 06 Y:2011 | 06 | 2011 | INSTALL SKYLIGHTS | $8,562 | $25,530 | Not Implemented |
MA0667 # 08 Y:2011 | 08 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,129 | $6,340 | Not Implemented |