IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

315

matching recommendations
Reset
SIC 3829 Measuring & Controlling Devices, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0117 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,328 $484 Implemented
WV0117 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,793 $3,114 Implemented
WV0117 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $63 $30 Implemented
WV0117 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,037 $417 Not Implemented
WV0117 # 05 Y:1997 05 1997 USE SYNTHETIC LUBRICANT $907 $615 Not Implemented
WV0117 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,795 $200 Implemented
WV0117 # 07 Y:1997 07 1997 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,252 $1,175 Not Implemented
WV0117 # 08 Y:1997 08 1997 RECOVER WASTE HEAT FROM EQUIPMENT $4,386 $1,000 Not Implemented
WV0117 # 09 Y:1997 09 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,683 $3,740 Not Implemented
WV0117 # 10 Y:1997 10 1997 INSTALL AUTOMATIC STACK DAMPER $3,753 $1,600 Not Implemented
WV0117 # 11 Y:1997 11 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $453 $0 Implemented
WV0117 # 12 Y:1997 12 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,387 $0 Implemented
WV0117 # 13 Y:1997 13 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,160 $200 Implemented
WV0117 # 14 Y:1997 14 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,300,000 $125,000 Not Implemented
UD0497 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $1,514 $1,500 Not Implemented
UD0497 # 02 Y:1996 02 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,460 $300 Not Implemented
UD0497 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,035 $20,230 Implemented
UD0497 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,760 $13,724 Implemented
NC0095 # 01 Y:1996 01 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,105 $5,000 Implemented
NC0095 # 02 Y:1996 02 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $641 $0 Not Implemented
NC0095 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $549 $2,100 Not Implemented
NC0095 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,473 $6,046 Implemented
NC0095 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $195 $90 Implemented
NC0095 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $439 $400 Not Implemented
NC0095 # 07 Y:1996 07 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $367 $367 Not Implemented