Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1996 |
Principal Product | Sensors |
NAICS | n/a |
SIC | 3829 - Measuring & Controlling Devices, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 81,500 |
Annual Production | 65,000 Pieces |
Production Hrs. Annual | 2,750 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $71,719 | 1,461,606 | kWh | $0.05 |
Electricity Demand | $31,665 | 6,476 | kW-months/year | $4.89 |
Electricity Fees | $3,626 | - | $ | - |
Natural Gas | $3,153 | 522 | MMBtu | $6.04 |
TOTAL ENERGY COSTS | $110,201 | |||
RECOMMENDED SAVINGS* | $8,829 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,773 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $1,105 Cost: $5,000 |
- | - | $1,105 | 226 | - | - | - | - |
- - kWh |
$1,105 226 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $641 Cost: - |
- | - | $641 | 131 | - | - | - | - |
- - kWh |
$641 131 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $549 Cost: $2,100 |
$349 | 7,327 | $50 | 10 | - | - | $150 | - |
$349 7,327 kWh |
$50 10 kW-months/year |
- - lb |
$150 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,473 Cost: $6,046 |
$3,081 | 65,358 | $1,392 | 285 | - | - | - | - |
$3,081 65,358 kWh |
$1,392 285 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $195 Cost: $90 |
$166 | 3,517 | $29 | 5 | - | - | - | - |
$166 3,517 kWh |
$29 5 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $439 Cost: $400 |
$347 | 7,327 | $92 | 19 | - | - | - | - |
$347 7,327 kWh |
$92 19 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $367 Cost: $367 |
$234 | 4,982 | $133 | 27 | - | - | - | - |
$234 4,982 kWh |
$133 27 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $1,022 Cost: $320 |
$704 | 14,947 | $318 | 65 | - | - | - | - |
$704 14,947 kWh |
$318 65 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $38 Cost: $100 |
- | - | - | - | $38 | 2,500 | - | - |
- - kWh |
- - kW-months/year |
$38 2,500 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $8,829 Cost: $14,423 |
$4,881 | 103,458 | $3,760 | 768 | $38 | 2,500 | $150 | - | $4,881 103,458 kWh |
$3,760 768 kW-months/year |
$38 2,500 lb |
$150 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,773 Cost: $11,136 |
$3,247 | 68,875 | $2,526 | 516 | - | - | - | - | $3,247 68,875 kWh |
$2,526 516 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost |