IAC logo
IAC Assessment: NC0095
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0095
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1996
Principal Product Sensors
NAICS n/a
SIC 3829 - Measuring & Controlling Devices, Nec
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 81,500
Annual Production 65,000 Pieces
Production Hrs. Annual 2,750
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,719 1,461,606 kWh $0.05
Electricity Demand $31,665 6,476 kW-months/year $4.89
Electricity Fees $3,626 - $ -
Natural Gas $3,153 522 MMBtu $6.04
TOTAL ENERGY COSTS $110,201
RECOMMENDED SAVINGS* $8,829 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,773
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,105
Cost:
$5,000
- - $1,105 226 - - - - -
-
kWh
$1,105
226
kW-months/year
-
-
lb
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$641
Cost:
-
- - $641 131 - - - - -
-
kWh
$641
131
kW-months/year
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$549
Cost:
$2,100
$349 7,327 $50 10 - - $150 - $349
7,327
kWh
$50
10
kW-months/year
-
-
lb
$150
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,473
Cost:
$6,046
$3,081 65,358 $1,392 285 - - - - $3,081
65,358
kWh
$1,392
285
kW-months/year
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$195
Cost:
$90
$166 3,517 $29 5 - - - - $166
3,517
kWh
$29
5
kW-months/year
-
-
lb
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$439
Cost:
$400
$347 7,327 $92 19 - - - - $347
7,327
kWh
$92
19
kW-months/year
-
-
lb
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$367
Cost:
$367
$234 4,982 $133 27 - - - - $234
4,982
kWh
$133
27
kW-months/year
-
-
lb
-
-
$
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,022
Cost:
$320
$704 14,947 $318 65 - - - - $704
14,947
kWh
$318
65
kW-months/year
-
-
lb
-
-
$
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$38
Cost:
$100
- - - - $38 2,500 - - -
-
kWh
-
-
kW-months/year
$38
2,500
lb
-
-
$
TOTAL RECOMMENDED Savings:
$8,829
Cost:
$14,423
$4,881 103,458 $3,760 768 $38 2,500 $150 - $4,881
103,458
kWh
$3,760
768
kW-months/year
$38
2,500
lb
$150
-
$
TOTAL IMPLEMENTED Savings:
$5,773
Cost:
$11,136
$3,247 68,875 $2,526 516 - - - - $3,247
68,875
kWh
$2,526
516
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost