IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3829 Measuring & Controlling Devices, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0854 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,399 $3,125 Implemented
MA0854 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,126 $1,425 Not Implemented
MA0854 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $3,953 $6,018 Implemented
MA0854 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,725 $7,950 Not Implemented
MA0854 # 02 Y:2023 02 2023 REDUCE VENTILATION AIR $4,889 $35,240 Not Implemented
MA0854 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,825 $12,405 Implemented
MA0783 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $924 $2,760 Implemented
MA0783 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,297 $14,420 Implemented
MA0783 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,697 $19,975 Not Implemented
MA0783 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $17,909 $431,094 Not Implemented
MA0667 # 10 Y:2011 10 2011 INSTALL AUTOMATIC STACK DAMPER $729 $180 Implemented
MA0667 # 12 Y:2011 12 2011 INSULATE BARE EQUIPMENT $98 $201 Not Implemented
MA0667 # 11 Y:2011 11 2011 INSULATE BARE EQUIPMENT $525 $550 Not Implemented
MA0667 # 09 Y:2011 09 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,515 $4,000 Not Implemented
MA0667 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,129 $6,340 Not Implemented
MA0667 # 07 Y:2011 07 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,047 $17,500 Not Implemented
MA0667 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,246 $3,000 Not Implemented
MA0667 # 05 Y:2011 05 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,023 $250 Implemented
MA0667 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $8,118 $0 Implemented
MA0667 # 03 Y:2011 03 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $11,694 $10,590 Implemented
MA0667 # 02 Y:2011 02 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $31,118 $100,000 Not Implemented
MA0667 # 01 Y:2011 01 2011 REDUCE VENTILATION AIR $45,912 $17,705 Not Implemented
MA0434 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $3,090 $8,125 Not Implemented
MA0434 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $71 $50 Implemented
MA0434 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $230 $130 Implemented