Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 384 | Medical Instruments And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0434 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,543 | $17,630 | Implemented |
UM0434 # 03 Y:2013 | 03 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $7,121 | $16,500 | Implemented |
UM0434 # 06 Y:2013 | 06 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,318 | $2,500 | Implemented |
SU0350 # 11 Y:2013 | 11 | 2013 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $221 | $616 | Implemented |
SU0350 # 12 Y:2013 | 12 | 2013 | UPGRADE OBSOLETE EQUIPMENT | $189 | $852 | Implemented |
SU0350 # 09 Y:2013 | 09 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $347 | $771 | Implemented |
SU0350 # 04 Y:2013 | 04 | 2013 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $30,158 | $131 | Implemented |
SU0350 # 01 Y:2013 | 01 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,408 | $0 | Implemented |
SU0350 # 03 Y:2013 | 03 | 2013 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,239 | $0 | Implemented |
SU0350 # 02 Y:2013 | 02 | 2013 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $8,049 | $0 | Implemented |
SU0350 # 05 Y:2013 | 05 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $741 | $191 | Implemented |
SU0350 # 07 Y:2013 | 07 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $579 | $340 | Implemented |
SU0350 # 06 Y:2013 | 06 | 2013 | INSULATE FEEDWATER TANK | $579 | $190 | Implemented |
UM0432 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,532 | $200 | Implemented |
UM0432 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,790 | $2,500 | Implemented |
UM0432 # 01 Y:2013 | 01 | 2013 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $10,000 | $10,000 | Implemented |
LE0359 # 03 Y:2013 | 03 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $4,813 | $1,554 | Implemented |
LE0359 # 07 Y:2013 | 07 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $2,600 | $1,000 | Implemented |
LE0359 # 05 Y:2013 | 05 | 2013 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $2,575 | $22 | Implemented |
LE0359 # 02 Y:2013 | 02 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,316 | $2,704 | Implemented |
MI0241 # 04 Y:2013 | 04 | 2013 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,960 | $540 | Implemented |
MI0241 # 05 Y:2013 | 05 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,883 | $4,691 | Implemented |
MI0241 # 06 Y:2013 | 06 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,564 | $440 | Implemented |
MI0241 # 08 Y:2013 | 08 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,942 | $2,196 | Implemented |
MI0241 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,593 | $1,660 | Implemented |