IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 384 Medical Instruments And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0241 # 02 Y:2024 02 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $7,985 $4,420 n/a
DL0241 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,075 $5,000 n/a
DL0241 # 01 Y:2024 01 2024 RECOVER WASTE HEAT FROM EQUIPMENT $30,655 $117,000 n/a
DL0075 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $4,000 $5,000 Not Implemented
DL0075 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,400 $740 Not Implemented
DL0075 # 05 Y:2011 05 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,900 $9,250 Not Implemented
DL0075 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $719 $1,100 Not Implemented
DL0075 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,281 $5,000 Not Implemented
DL0075 # 04 Y:2011 04 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,900 $2,920 Not Implemented
DL0075 # 03 Y:2011 03 2011 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $14,910 $47,500 Not Implemented
DL0075 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,000 $10,910 Not Implemented
DL0075 # 01 Y:2011 01 2011 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $17,900 $6,660 Not Implemented
DL0058 # 06 Y:2010 06 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,400 $100 Not Implemented
DL0058 # 12 Y:2010 12 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,140 $5,050 Not Implemented
DL0058 # 11 Y:2010 11 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,215 $2,500 Not Implemented
DL0058 # 10 Y:2010 10 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,110 $18,280 Not Implemented
DL0058 # 09 Y:2010 09 2010 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,200 $10,000 Not Implemented
DL0058 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,000 $7,644 Implemented
DL0058 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,080 $6,300 Not Implemented
DL0058 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $11,800 $250 Implemented
DL0058 # 04 Y:2010 04 2010 DISCONNECT BALLASTS $12,500 $350 Not Implemented
DL0058 # 03 Y:2010 03 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $143,000 $4,268 Implemented
DL0058 # 02 Y:2010 02 2010 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $95,200 $250,000 Not Implemented
DL0058 # 01 Y:2010 01 2010 REDUCE VENTILATION AIR $152,300 $500,000 Not Implemented
DL0026 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,327 $640 Not Implemented