IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,840

matching recommendations
Reset
SIC 384 Medical Instruments And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0333 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $2,191 $2,240 Implemented
MI0333 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $826 Implemented
SD0563 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $22,261 $80,415 Not Implemented
SD0563 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,544 $27,042 Not Implemented
SD0563 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,919 $2,796 Implemented
SD0563 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,076 $1,500 Implemented
SD0563 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $956 $2,850 Implemented
SD0563 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $620 $600 Implemented
UF0516 # 01 Y:2018 01 2018 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $120,914 $400,000 Not Implemented
UF0516 # 02 Y:2018 02 2018 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,142 $18,013 Implemented
UF0516 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,159 $12,014 Implemented
UF0516 # 04 Y:2018 04 2018 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $200,000 $100,000 Not Implemented
UF0516 # 05 Y:2018 05 2018 MOVE PRODUCT USING MECHANICAL MEANS $42,000 $70,000 Implemented
UF0516 # 06 Y:2018 06 2018 INSTALL EQUIPMENT TO MOVE PRODUCT $30,207 $5,350 Not Implemented
UF0516 # 07 Y:2018 07 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,725 $10,695 Not Implemented
MA0789 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,415 $29,288 Implemented
MA0789 # 02 Y:2018 02 2018 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $9,053 $960 Not Implemented
MA0789 # 03 Y:2018 03 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,660 $1,200 Not Implemented
MA0789 # 04 Y:2018 04 2018 REPLACE ELECTRIC REHEAT WITH HEAT PIPES $2,881 $6,120 Not Implemented
MA0789 # 05 Y:2018 05 2018 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,779 $960 Not Implemented
SD0562 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $27,423 $97,740 Implemented
SD0562 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,835 $13,230 Implemented
SD0562 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,116 $10,515 Not Implemented
SD0562 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,214 $1,000 Implemented
SD0562 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,279 $600 Implemented