IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,788

matching recommendations
Reset
SIC 384 Medical Instruments And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0166 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $757 $136 Not Implemented
IC0166 # 04 Y:2009 04 2009 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,442 $1,720 Not Implemented
IC0166 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $84 $345 Implemented
IC0166 # 06 Y:2009 06 2009 INSTALL TIMERS AND/OR THERMOSTATS $134 $0 Implemented
IC0166 # 07 Y:2009 07 2009 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $3,264 $16,200 Not Implemented
IC0166 # 08 Y:2009 08 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $659 $0 Not Implemented
MI0181 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $218,599 $25,000 Implemented
MI0181 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $143,524 $2,000 Implemented
MI0181 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $62,935 $60,000 Not Implemented
MI0181 # 04 Y:2009 04 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $50,254 $2,000 Implemented
MI0181 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,674 $1,210 Implemented
MI0181 # 06 Y:2009 06 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,403 $4,531 Not Implemented
MI0181 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $40 Implemented
MA0650 # 01 Y:2009 01 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,218 $10,000 Not Implemented
MA0650 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $1,735 $0 Implemented
MA0650 # 03 Y:2009 03 2009 REDUCE VENTILATION AIR $581 $2,300 Implemented
MA0650 # 04 Y:2009 04 2009 REDUCE VENTILATION AIR $250 $0 Implemented
MA0650 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $213 $0 Implemented
DL0026 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $38,000 $0 Implemented
DL0026 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,500 $0 Implemented
DL0026 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $11,841 $1,430 Not Implemented
DL0026 # 04 Y:2008 04 2008 REDUCE VENTILATION AIR $9,470 $0 Not Implemented
DL0026 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,327 $640 Not Implemented
DL0026 # 06 Y:2008 06 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,600 $2,800 Not Implemented
DL0026 # 07 Y:2008 07 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,000 $40,000 Implemented