IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

485

matching recommendations
Reset
SIC 3841 Surgical And Medical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0018 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,006 $1,000 Implemented
UU0018 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $4,721 $1,900 Implemented
CO0488 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,910 $3,000 Implemented
CO0488 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,650 $0 Implemented
CO0488 # 05 Y:2001 05 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $900 $0 Implemented
CO0488 # 07 Y:2001 07 2001 USE CYLINDRICAL TANKS WITH HEIGHT TO DIAMETER RATIOS CLOSE TO ONE TO REDUCE WETTED SURFACE $3,610 $180 Implemented
OK0609 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,112 $0 Implemented
MA0443 # 02 Y:1999 02 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $656 $150 Implemented
MA0443 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $927 $325 Implemented
MA0443 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $287 $1,975 Implemented
MA0443 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $792 $60 Implemented
AR0166 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,860 $6,552 Implemented
AR0166 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $20,587 $16,587 Implemented
AR0166 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $23,676 $38,630 Implemented
AR0166 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,702 $4,980 Implemented
NC0142 # 01 Y:1998 01 1998 INSTALL TIMERS AND/OR THERMOSTATS $2,463 $1,050 Implemented
NC0142 # 02 Y:1998 02 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,239 $0 Implemented
NC0142 # 03 Y:1998 03 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,688 $1,200 Implemented
NC0142 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,279 $31,754 Implemented
NC0142 # 07 Y:1998 07 1998 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,435 $10 Implemented
NC0142 # 09 Y:1998 09 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $75 $0 Implemented
ND0292 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,922 $2,510 Implemented
ND0292 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $2,468 $338 Implemented
ND0292 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,452 $6,303 Implemented
ND0292 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,679 $80 Implemented