IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,032

matching recommendations
Reset
SIC 3841 Surgical And Medical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0385 # 07 Y:2020 07 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,275 $234 Implemented
MI0385 # 08 Y:2020 08 2020 INSULATE BARE EQUIPMENT $754 $1,614 Not Implemented
SF0565 # 01 Y:2021 01 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $770 $0 Not Implemented
SF0565 # 02 Y:2021 02 2021 AIR CONDITION ONLY SPACE NECESSARY $35,739 $5,236 Implemented
SF0565 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,884 $1,122 Not Implemented
SF0565 # 04 Y:2021 04 2021 INSTALL SPECTRAL REFLECTORS / DELAMP $603 $135 Not Implemented
SF0565 # 05 Y:2021 05 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $294 $90 Not Implemented
SF0565 # 06 Y:2021 06 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,819 $622 Implemented
SF0565 # 07 Y:2021 07 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $445 $3,212 Not Implemented
UU0167 # 01 Y:2020 01 2020 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $471,950 $2,795,000 Not Implemented
UU0167 # 02 Y:2020 02 2020 TREAT AND REUSE RINSE WATERS $72,249 $60,000 Implemented
UU0167 # 03 Y:2020 03 2020 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $35,350 $180,000 Implemented
UU0167 # 04 Y:2020 04 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $12,331 $22,500 Not Implemented
UU0167 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,178 $17,274 Implemented
MA0812 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $228,815 $892,794 Not Implemented
MA0812 # 02 Y:2020 02 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $56,847 $3,250 Not Implemented
MA0812 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,615 $32,940 Implemented
MA0812 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,190 $5,960 Implemented
MA0812 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,774 $16,650 Implemented
MA0812 # 06 Y:2020 06 2020 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,604 $500 Not Implemented
MA0813 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $60,067 $253,810 Not Implemented
MA0813 # 02 Y:2020 02 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,202 $27,887 Not Implemented
MA0813 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,915 $1,000 Not Implemented
MA0813 # 04 Y:2020 04 2020 OPTIMIZE PLANT POWER FACTOR $4,535 $8,890 Not Implemented
MA0813 # 05 Y:2020 05 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,060 $9,957 Not Implemented