IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3841 Surgical And Medical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0018 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $4,721 $1,900 Implemented
UU0018 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,006 $1,000 Implemented
UU0018 # 03 Y:2001 03 2001 USE SYNTHETIC LUBRICANT $1,814 $0 Not Implemented
UU0018 # 02 Y:2001 02 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,498 $1,588 Not Implemented
UU0018 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,387 $127,085 Implemented
MI0024 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $2 n/a
MI0024 # 04 Y:2001 04 2001 ADD AREA LIGHTING SWITCHES $1,333 $700 n/a
MI0024 # 03 Y:2001 03 2001 ADD AREA LIGHTING SWITCHES $2,108 $1,000 n/a
MI0024 # 02 Y:2001 02 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,590 $7 n/a
MI0024 # 01 Y:2001 01 2001 ISOLATE HOT OR COLD EQUIPMENT $156,000 $10,000 n/a
CO0488 # 02 Y:2001 02 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,300 $6,000 Not Implemented
CO0488 # 07 Y:2001 07 2001 USE CYLINDRICAL TANKS WITH HEIGHT TO DIAMETER RATIOS CLOSE TO ONE TO REDUCE WETTED SURFACE $3,610 $180 Implemented
CO0488 # 06 Y:2001 06 2001 REPLACE HEAVY METAL REAGENTS WITH NON-HAZARDOUS REAGENTS $21,060 $14,000 Not Implemented
CO0488 # 05 Y:2001 05 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $900 $0 Implemented
CO0488 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,650 $0 Implemented
CO0488 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,660 $2,200 Not Implemented
CO0488 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,910 $3,000 Implemented
MI0002 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,034 $3,531 Not Implemented
MI0002 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,800 $35 Not Implemented
MI0002 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,119 $690 Not Implemented
MI0002 # 08 Y:2001 08 2001 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,409 $20 Not Implemented
MI0002 # 09 Y:2001 09 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $94,000 $33,124 Not Implemented
MI0002 # 04 Y:2001 04 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $47,000 $300 Not Implemented
MI0002 # 03 Y:2001 03 2001 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $30,943 $20 Not Implemented
MI0002 # 02 Y:2001 02 2001 UPGRADE OBSOLETE EQUIPMENT $22,409 $6,500 Not Implemented