IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3841 Surgical And Medical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0379 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $916 $1,155 Not Implemented
IA0379 # 01 Y:2005 01 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $222 $182 Not Implemented
IA0379 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $109 $50 Not Implemented
IA0379 # 03 Y:2005 03 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $602 $800 Not Implemented
IA0379 # 04 Y:2005 04 2005 REDUCE VENTILATION AIR $2,513 $320 Not Implemented
TA0107 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $355 $510 Not Implemented
TA0107 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $488 $110 Not Implemented
TA0107 # 03 Y:2005 03 2005 UPGRADE CONTROLS ON COMPRESSORS $900 $300 Implemented
TA0107 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,100 $128 Implemented
TA0107 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,800 $4,390 Implemented
MI0111 # 01 Y:2005 01 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,372 $200 Not Implemented
MI0111 # 02 Y:2005 02 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,290 $84 Implemented
MI0111 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,062 $7,706 Implemented
MI0111 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,249 $0 Not Implemented
MI0111 # 05 Y:2005 05 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $873 $1,673 Not Implemented
UU0084 # 02 Y:2005 02 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $697 $2,150 Not Implemented
UU0084 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,537 $0 Not Implemented
UU0084 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $506 $235 Not Implemented
UU0084 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $491 $200 Not Implemented
UU0084 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $4,429 $5,220 Not Implemented
UU0084 # 07 Y:2005 07 2005 COMBINE UTILITY METERS $575 $315 Not Implemented
UU0084 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,643 $6,171 Not Implemented
IA0361 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $577 $1,080 Not Implemented
IA0361 # 05 Y:2005 05 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $421 $850 Implemented
IA0361 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,960 $1,114 Implemented