Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsSIC | 3841 | Surgical And Medical Instruments |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0993 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $626 | $5,696 | Implemented |
OK0993 # 01 Y:2018 | 01 | 2018 | OPTIMIZE PLANT POWER FACTOR | $11,376 | $41,363 | Implemented |
OK0993 # 04 Y:2018 | 04 | 2018 | USE RADIANT HEATER FOR SPOT HEATING | $3,414 | $13,656 | Not Implemented |
OK0993 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,437 | $19,768 | Implemented |
MI0342 # 03 Y:2018 | 03 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $32,500 | $15,000 | Implemented |
MI0342 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $56,921 | $3,280 | Implemented |
MI0342 # 02 Y:2018 | 02 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $48,793 | $800 | Implemented |
MI0342 # 04 Y:2018 | 04 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $15,291 | $14,298 | Implemented |
MI0342 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,885 | $4,165 | Implemented |
MI0342 # 06 Y:2018 | 06 | 2018 | OPTIMIZE PLANT POWER FACTOR | $3,475 | $14,430 | Not Implemented |
MI0342 # 07 Y:2018 | 07 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $770 | $80 | Implemented |
MI0337 # 04 Y:2018 | 04 | 2018 | INSULATE BARE EQUIPMENT | $26,104 | $3,000 | Implemented |
MI0337 # 11 Y:2018 | 11 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,571 | $6,578 | Implemented |
MI0337 # 10 Y:2018 | 10 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,724 | $7,314 | Implemented |
MI0337 # 09 Y:2018 | 09 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,557 | $2,528 | Not Implemented |
MI0337 # 08 Y:2018 | 08 | 2018 | INSTALL OCCUPANCY SENSORS | $14,515 | $19,215 | Implemented |
MI0337 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,813 | $2,030 | Implemented |
MI0337 # 06 Y:2018 | 06 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,780 | $78,320 | Not Implemented |
MI0337 # 05 Y:2018 | 05 | 2018 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $24,458 | $31,600 | Not Implemented |
MI0337 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,197 | $11,846 | Not Implemented |
MI0337 # 02 Y:2018 | 02 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $41,184 | $480 | Implemented |
MI0337 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $45,349 | $76,979 | Implemented |
MI0333 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $328 | $826 | Implemented |
MI0333 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $2,191 | $2,240 | Implemented |
MI0333 # 06 Y:2018 | 06 | 2018 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $4,911 | $80 | Implemented |