IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 3842 Surgical Appliances And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0208 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $439 $600 Not Implemented
TT0208 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,732 $2,250 Not Implemented
TT0208 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $3,716 $2,030 Not Implemented
TT0208 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,089 $400 Implemented
TT0208 # 02 Y:2018 02 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,000 $2,500 Not Implemented
TT0208 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,976 $33,750 Not Implemented
TT0179 # 05 Y:2016 05 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,568 $4,800 Implemented
TT0179 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $167 $195 Not Implemented
TT0179 # 09 Y:2016 09 2016 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $319 $421 Not Implemented
TT0179 # 08 Y:2016 08 2016 DEVELOP A REPAIR/REPLACE POLICY $415 $1,064 Not Implemented
TT0179 # 07 Y:2016 07 2016 UPGRADE CONTROLS ON COMPRESSORS $802 $2,000 Not Implemented
TT0179 # 06 Y:2016 06 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,325 $0 Not Implemented
TT0179 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,217 $0 Implemented
TT0179 # 03 Y:2016 03 2016 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,391 $0 Implemented
TT0179 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $6,035 $0 Implemented
TT0179 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,880 $54,314 Not Implemented
TN0202 # 04 Y:1984 04 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16 $0 Implemented
TN0202 # 03 Y:1984 03 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $87 $20 Implemented
TN0202 # 02 Y:1984 02 1984 REDUCE VENTILATION AIR $48 $250 Implemented
TN0202 # 01 Y:1984 01 1984 LOWER CEILING TO REDUCE CONDITIONED SPACE $283 $3,500 Implemented
TN0195 # 01 Y:1983 01 1983 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,275 $0 Not Implemented
TN0195 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $4,562 $1,030 Not Implemented
TN0195 # 02 Y:1983 02 1983 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,191 $0 Not Implemented