IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 3842 Surgical Appliances And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0179 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $167 $195 Not Implemented
TT0179 # 09 Y:2016 09 2016 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $319 $421 Not Implemented
TT0179 # 08 Y:2016 08 2016 DEVELOP A REPAIR/REPLACE POLICY $415 $1,064 Not Implemented
TT0179 # 07 Y:2016 07 2016 UPGRADE CONTROLS ON COMPRESSORS $802 $2,000 Not Implemented
TT0179 # 06 Y:2016 06 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,325 $0 Not Implemented
TT0179 # 05 Y:2016 05 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,568 $4,800 Implemented
TT0179 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,217 $0 Implemented
TT0179 # 03 Y:2016 03 2016 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,391 $0 Implemented
TT0179 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $6,035 $0 Implemented
TT0179 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,880 $54,314 Not Implemented
IP0060 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,162 $220 Implemented
IP0060 # 01 Y:2016 01 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,498 $30 Implemented
IP0060 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,282 $1,568 Implemented
IP0060 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,256 $2,750 Not Implemented
IP0060 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $3,107 $725 Implemented
IP0060 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,749 $638 Implemented
IP0060 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,644 $3,840 Implemented
IP0060 # 08 Y:2016 08 2016 USE MAGNETIC TECHNOLOGY TO TREAT WATER $300 $416 Not Implemented
IP0060 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $268 $463 Not Implemented
MI0290 # 14 Y:2016 14 2016 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $396 $317 Implemented
MI0290 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $81,253 $1,120 Implemented
MI0290 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $50,831 $40 Implemented
MI0290 # 03 Y:2016 03 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $22,761 $41,950 Not Implemented
MI0290 # 13 Y:2016 13 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,396 $3,240 Not Implemented
MI0290 # 12 Y:2016 12 2016 REDUCE HEAT GAIN BY WINDOW TINTING $1,443 $2,240 Not Implemented