Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
61
matching recommendationsSIC | 3843 | Dental Equipment And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0621 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $26,440 | $12,390 | Implemented |
UF0621 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $106,203 | $322,608 | Implemented |
UF0621 # 08 Y:2024 | 08 | 2024 | DEVELOP STANDARD OPERATING PROCEDURES | $15,000 | $700 | Implemented |
UF0621 # 09 Y:2024 | 09 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $15,000 | $3,868 | Implemented |
UF0621 # 05 Y:2024 | 05 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,374 | $17,850 | Implemented |
UF0621 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,670 | $4,795 | Implemented |
UF0621 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,063 | $456 | Implemented |
UF0621 # 11 Y:2024 | 11 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $11,856 | $4,760 | Implemented |
UU0199 # 01 Y:2022 | 01 | 2022 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $9,239 | $4,868 | Implemented |
UU0199 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,264 | $2,575 | Implemented |
SD0563 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $956 | $2,850 | Implemented |
SD0563 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $620 | $600 | Implemented |
SD0563 # 03 Y:2018 | 03 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,919 | $2,796 | Implemented |
SD0563 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,076 | $1,500 | Implemented |
SD0562 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,279 | $600 | Implemented |
SD0562 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,214 | $1,000 | Implemented |
SD0562 # 01 Y:2018 | 01 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $27,423 | $97,740 | Implemented |
SD0562 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,835 | $13,230 | Implemented |
MZ0212 # 06 Y:2016 | 06 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $632 | $0 | Implemented |
MZ0212 # 10 Y:2016 | 10 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $825 | $3,500 | Implemented |
MZ0212 # 07 Y:2016 | 07 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,393 | $0 | Implemented |
MZ0212 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,550 | $920 | Implemented |
MZ0212 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,509 | $34,515 | Implemented |
LE0359 # 02 Y:2013 | 02 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,316 | $2,704 | Implemented |
LE0359 # 03 Y:2013 | 03 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $4,813 | $1,554 | Implemented |