IAC Assessment: SD0562
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0562
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2018
Principal Product Dental Implants & Abutments
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3843 - Dental Equipment And Supplies
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 121,000
Annual Production 4,000,000 Units
Production Hrs. Annual 7,344
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $199,385 2,958,198 kWh $0.07
Electricity Demand $12,803 476 kW-months/year $26.91
Electricity Fees $8,252 - $ -
Natural Gas $3,399 399 MMBtu $8.52
TOTAL ENERGY COSTS $223,839
RECOMMENDED SAVINGS* $39,867 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,751
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$27,423
Cost:
$97,740
$(-1,336) (-19,820) $28,759 1,173 - - $(-1,336)
(-19,820)
kWh
$28,759
1,173
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,835
Cost:
$13,230
$3,347 49,681 $2,431 90 $57 - $3,347
49,681
kWh
$2,431
90
kW-months/year
$57
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,116
Cost:
$10,515
$3,116 46,227 - - - - $3,116
46,227
kWh
-
-
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,214
Cost:
$1,000
$2,214 32,842 - - - - $2,214
32,842
kWh
-
-
kW-months/year
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,279
Cost:
$600
$1,279 18,976 - - - - $1,279
18,976
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$39,867
Cost:
$123,085
$8,620 127,906 $31,190 1,263 $57 - $8,620
127,906
kWh
$31,190
1,263
kW-months/year
$57
-
$
TOTAL IMPLEMENTED Savings:
$36,751
Cost:
$112,570
$5,504 81,679 $31,190 1,263 $57 - $5,504
81,679
kWh
$31,190
1,263
kW-months/year
$57
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost