IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169

matching recommendations
Reset
SIC 385 Ophthalmic Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0270 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,802 $10,421 Not Implemented
MO0270 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $235 $53 Not Implemented
MO0270 # 04 Y:1999 04 1999 USE A DIFFERENT OR RECYCLED RAW MATERIAL $720 $1,800 Not Implemented
MO0270 # 05 Y:1999 05 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $76,792 $0 Not Implemented
MO0270 # 06 Y:1999 06 1999 CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY $4,407 $0 Not Implemented
UF0137 # 01 Y:1996 01 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $21,085 $5,000 Not Implemented
UF0137 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,664 $350 Implemented
UF0137 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,358 $34,340 Not Implemented
UF0137 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $9,176 $14,000 Implemented
UF0137 # 05 Y:1996 05 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $600 $0 Not Implemented
UF0137 # 06 Y:1996 06 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $21,580 $0 Implemented
UF0137 # 07 Y:1996 07 1996 MINIMIZE WATER USAGE $3,477 $3,400 Not Implemented
UF0137 # 08 Y:1996 08 1996 METER WASTE WATER $1,788 $2,000 Implemented
DS0021 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,340 $6,603 Implemented
DS0021 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $193 $363 Implemented
DS0021 # 03 Y:1995 03 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $311 $463 Implemented
DS0021 # 04 Y:1995 04 1995 INSTALL TIMERS AND/OR THERMOSTATS $1,556 $1,950 Implemented
DS0021 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $232 $68 Implemented
DS0021 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $348 $1,630 Implemented
WV0015 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,512 $1,967 Implemented
WV0015 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,304 $46,430 Implemented
WV0015 # 03 Y:1993 03 1993 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,335 $250 Implemented
WV0015 # 04 Y:1993 04 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,175 $870 Implemented
WV0015 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $669 $244 Implemented
WV0015 # 06 Y:1993 06 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $8,836 $1,961 Implemented