IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
Reset
SIC 386 Photographic Equipment And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0668 # 07 Y:2003 07 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $50,260 $51,780 Not Implemented
OK0668 # 08 Y:2003 08 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,772 $9,500 Not Implemented
OK0668 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $1,369 $1,455 Implemented
OK0668 # 10 Y:2003 10 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,501 $6,296 Not Implemented
OK0668 # 11 Y:2003 11 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,447 $112,608 n/a
OK0668 # 12 Y:2003 12 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,404 $34,425 n/a
OK0668 # 13 Y:2003 13 2003 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $38,034 $1,647 Implemented
AS0335 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $400 $1,425 Not Implemented
AS0335 # 02 Y:2002 02 2002 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $501 $200 Not Implemented
AS0335 # 03 Y:2002 03 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,394 $32,550 Not Implemented
AS0335 # 04 Y:2002 04 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,813 $0 Not Implemented
AS0335 # 05 Y:2002 05 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,738 $15,320 Not Implemented
UD0644 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $462,150 $500 Not Implemented
UD0644 # 02 Y:2002 02 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,360 $0 Implemented
UD0644 # 03 Y:2002 03 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,612 $0 Not Implemented
UD0644 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,397 $13,222 Not Implemented
UD0644 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,764 $2,775 Not Implemented
UD0644 # 06 Y:2002 06 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,953 $131 Implemented
UD0644 # 07 Y:2002 07 2002 AIR CONDITION ONLY SPACE NECESSARY $1,285 $0 Implemented
UD0644 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $478 $500 Not Implemented
UD0644 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $475 $1,348 Implemented
TA0020 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,175 $26,460 n/a
TA0020 # 02 Y:2001 02 2001 PAY BILLS ON TIME TO AVOID LATE FEES $4,751 $0 Implemented
TA0020 # 03 Y:2001 03 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,260 $240 Implemented
TA0020 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,415 $1,715 Implemented