IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
Reset
SIC 386 Photographic Equipment And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0402 # 09 Y:1990 09 1990 IMPROVE LUBRICATION PRACTICES $57 $30 Not Implemented
MA0174 # 01 Y:1990 01 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $388 $649 Not Implemented
MA0174 # 02 Y:1990 02 1990 DIRECT WARMEST AIR TO COMBUSTION INTAKE $992 $865 Not Implemented
MA0174 # 03 Y:1990 03 1990 OPTIMIZE PLANT POWER FACTOR $62,064 $80,000 Implemented
MA0174 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,525 $120 Implemented
MA0174 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $6,525 $1,524 Implemented
MA0174 # 06 Y:1990 06 1990 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $24,108 $27,827 Not Implemented
MA0174 # 07 Y:1990 07 1990 RECOVER WASTE HEAT FROM EQUIPMENT $35,725 $19,518 Not Implemented
OK0225 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $886 $220 Implemented
OK0225 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $332 $1,101 Implemented
OK0225 # 03 Y:1987 03 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $71 $125 Implemented
OK0225 # 04 Y:1987 04 1987 USE RADIANT HEATER FOR SPOT HEATING $4,851 $16,900 Implemented
OK0225 # 05 Y:1987 05 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,012 $0 Implemented
OK0225 # 06 Y:1987 06 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $1,078 $5,558 Not Implemented
OK0225 # 07 Y:1987 07 1987 INSULATE BARE EQUIPMENT $181 $500 Implemented
MA0079 # 01 Y:1986 01 1986 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $478 $350 Implemented
MA0079 # 02 Y:1986 02 1986 REPAIR OR REPLACE STEAM TRAPS $4,572 $600 Implemented
MA0079 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,763 $4,700 Implemented
MA0079 # 04 Y:1986 04 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,519 $13,000 Not Implemented
MA0079 # 05 Y:1986 05 1986 USE OPTIMUM THICKNESS INSULATION $21,098 $5,000 Implemented
ST0034 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,370 $639 Not Implemented
ST0034 # 02 Y:1985 02 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,160 $80 Implemented
ST0034 # 03 Y:1985 03 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $330 $0 Implemented
ST0034 # 04 Y:1985 04 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $462 $870 Not Implemented
ST0034 # 05 Y:1985 05 1985 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $575 $1,200 Implemented