Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
123
matching recommendationsSIC | 3861 | Photographic Equipment And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0341 # 12 Y:2006 | 12 | 2006 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $498 | $25 | Not Implemented |
WV0341 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $2,679 | $543 | Implemented |
WV0341 # 04 Y:2006 | 04 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $2,635 | $2,695 | Not Implemented |
WV0341 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,253 | $1,270 | Implemented |
WV0341 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,073 | $1,800 | Implemented |
WV0341 # 06 Y:2006 | 06 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,532 | $600 | Not Implemented |
WV0341 # 07 Y:2006 | 07 | 2006 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,368 | $2,700 | Not Implemented |
WV0341 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,388 | $625 | Implemented |
WV0341 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $7,713 | $2,370 | Implemented |
WV0341 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $850 | $0 | Implemented |
WV0341 # 11 Y:2006 | 11 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $501 | $213 | Implemented |
WV0341 # 10 Y:2006 | 10 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $571 | $525 | Not Implemented |
OK0668 # 12 Y:2003 | 12 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,404 | $34,425 | n/a |
OK0668 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,013 | $38,456 | Implemented |
OK0668 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,597 | $0 | Implemented |
OK0668 # 03 Y:2003 | 03 | 2003 | INSTALL OCCUPANCY SENSORS | $6,113 | $1,885 | Implemented |
OK0668 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,150 | $61,955 | Not Implemented |
OK0668 # 05 Y:2003 | 05 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $67,238 | $0 | Implemented |
OK0668 # 10 Y:2003 | 10 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,501 | $6,296 | Not Implemented |
OK0668 # 11 Y:2003 | 11 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,447 | $112,608 | n/a |
OK0668 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $21,821 | $1,125 | Implemented |
OK0668 # 09 Y:2003 | 09 | 2003 | INSULATE BARE EQUIPMENT | $1,369 | $1,455 | Implemented |
OK0668 # 13 Y:2003 | 13 | 2003 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $38,034 | $1,647 | Implemented |
OK0668 # 08 Y:2003 | 08 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $31,772 | $9,500 | Not Implemented |
OK0668 # 07 Y:2003 | 07 | 2003 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $50,260 | $51,780 | Not Implemented |