IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,162

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0064 # 01 Y:2016 01 2016 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $839 $0 Implemented
IP0064 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $398 $5 Implemented
IP0064 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,306 $250 Implemented
IP0064 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,082 $700 Implemented
IP0064 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $538 $878 Implemented
IP0064 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $382 $888 Implemented
IP0064 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $893 $3,007 Implemented
IA0551 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,782 $23,025 Implemented
IA0551 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,938 $578 Implemented
IA0551 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,021 $2,627 Implemented
IA0551 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $989 $330 Implemented
IA0551 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $854 $70 Implemented
OK0930 # 03 Y:2015 03 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,131 $0 Implemented
IP0049 # 01 Y:2015 01 2015 PAY BILLS ON TIME TO AVOID LATE FEES $4,118 $0 Implemented
IP0049 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,197 $8 Implemented
IP0049 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,009 $70 Implemented
IP0049 # 11 Y:2015 11 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,976 $21,474 Implemented
SU0396 # 01 Y:2015 01 2015 PAY BILLS ON TIME TO AVOID LATE FEES $813 $0 Implemented
SU0396 # 02 Y:2015 02 2015 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $738 $0 Implemented
SU0396 # 04 Y:2015 04 2015 CHECK FOR ACCURACY OF UTILITY / POWER METERS $243 $0 Implemented
SU0396 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,889 $930 Implemented
SU0396 # 06 Y:2015 06 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,027 $20,360 Implemented
SU0396 # 08 Y:2015 08 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,009 $17,408 Implemented
SU0396 # 10 Y:2015 10 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $419 $0 Implemented
WM0074 # 02 Y:2015 02 2015 CONDENSE OPERATION INTO ONE BUILDING $2,174 $0 Implemented