IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1051 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $8,210 $4,500 Not Implemented
OK1051 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,449 $0 Not Implemented
OK1051 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,614 $677 Implemented
OK1051 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,640 $7,393 Implemented
OK1050 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,760 $900 Implemented
OK1050 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,327 $0 Not Implemented
OK1050 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $2,379 $1,973 Not Implemented
OK1008 # 07 Y:2019 07 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,690 $0 Not Implemented
OK1008 # 08 Y:2019 08 2019 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,146 $1,788 Not Implemented
OK1008 # 06 Y:2019 06 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $11,069 $0 Implemented
OK1008 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $19,941 $2,337 Not Implemented
OK1008 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,328 $2,128 Implemented
OK1008 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $107,652 $264,795 Implemented
OK1008 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,601 $16,747 Not Implemented
OK1008 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $108,355 $105,560 Not Implemented
OK0853 # 04 Y:2013 04 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,173 $240 Implemented
OK0853 # 05 Y:2013 05 2013 USE RADIANT HEATER FOR SPOT HEATING $6,694 $16,250 Not Implemented
OK0853 # 01 Y:2013 01 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $26,647 $7,150 Not Implemented
OK0853 # 03 Y:2013 03 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,083 $15,925 Not Implemented
OK0853 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,210 $300 Implemented
OK0853 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,264 $12,032 Not Implemented
OK0853 # 09 Y:2013 09 2013 OPTIMIZE PLANT POWER FACTOR $3,767 $7,526 Not Implemented
OK0853 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $763 $5,865 Not Implemented
OK0853 # 02 Y:2013 02 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,649 $4,550 Not Implemented
OK0793 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $88,705 $104,400 Implemented