IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,558

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1008 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $107,652 $264,795 Implemented
OK1008 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,328 $2,128 Implemented
OK1008 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $19,941 $2,337 Not Implemented
OK1008 # 06 Y:2019 06 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $11,069 $0 Implemented
OK1008 # 07 Y:2019 07 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,690 $0 Not Implemented
OK1008 # 08 Y:2019 08 2019 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,146 $1,788 Not Implemented
MA0798 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,625 $48,500 Implemented
MA0798 # 02 Y:2019 02 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,484 $80,000 Implemented
MA0798 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $7,569 $8,930 Not Implemented
MA0798 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,904 $2,765 Not Implemented
MA0798 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $3,333 $1,801 Implemented
MA0798 # 06 Y:2019 06 2019 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,585 $500 Not Implemented
MA0798 # 07 Y:2019 07 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,849 $2,001 Implemented
MA0798 # 08 Y:2019 08 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $922 $978 Not Implemented
MA0798 # 09 Y:2019 09 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $512 $200 Implemented
LE0466 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $482 $40 Not Implemented
LE0466 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,835 $750 Not Implemented
LE0466 # 03 Y:2018 03 2018 BURN A LESS EXPENSIVE GRADE OF FUEL $53,204 $20,000 Not Implemented
LE0466 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $158 $180 Not Implemented
LE0466 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,119 $7,950 Not Implemented
CL1808 # 01 Y:2018 01 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,900 $250 Not Implemented
CL1808 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,697 $3,911 Not Implemented
CL1808 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,135 $2,080 Not Implemented
CL1808 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $310 $0 Not Implemented
AM0753 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,100 $0 Not Implemented